Le Havre LNG Terminal

From A Barrel Full
Revision as of 10:46, 22 August 2020 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === Ownership: Gaz de Normandie Website: http://gazdenormandie.com/ Location: Le Havre Capacity: 7.0 million tons/annum Status: Planned Brief Descript...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

Ownership: Gaz de Normandie Website: http://gazdenormandie.com/ Location: Le Havre Capacity: 7.0 million tons/annum Status: Planned Brief Description

- Technical Details

Storage capacity: 3 tanks with a total of 170,000 m3 Unloading capacity: QatarMax LNG carriers with their 270,000 m3 capacity (130,000 tonnes) Send out capacity: Constructor: Tractabel, Full Owner's Engineer assignment covering: Pre-FEED review and optimisation of regasification system, Assistance to Public Debate, study of various technical solutions (GBS, reclaimed area,…), complete FEED Licensor: Ongoing Projects/Project Status

Capital expenditure currently estimated to be between €700- €800 million Final investment decision expected beginning 2011 Terminal commissioning in 2015 Suppliers / Customers

Suppliers: Customers: The terminal will feed the gas grid History

2009 - Application for permission to operate the terminal Other Information

The terminal is competing with the Dunkerque LNG Terminal to attract investors

Links =

  1. Gaz de Normandie has lodged its application for permission to operate the Antifer LNG terminal