Layang Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Nippon
- Country: Malaysia
- Location: Block SK10 offshore Sarawak
- Production start: Expected 2016
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The development consists of shallow water platforms, connected by flexible pipes to the [[[Deep Producer 1 FPSO]]]
- The pipes include two production risers and flowlines and one gas export riser and flowline
- The field will supply gas to the [[[Malaysia LNG Terminal]]]
+++ Contractors
- **TH Heavy Engineering:** Engineering, Procurement, Construction/Fabrication/Conversion, Installation and Hook-Up and Commissioning of FPSO
- **Sapurakencana:** Detailed engineering, procurement, construction, and commissioning
- **Technip:** Engineering, procurement, fabrication, installation and commissioning of three flexible pipes
+++ History
- 2014 - Field Development Plan approved
+++ Geology
Links
- MMCOG Platform References
- TH Heavy Engineering Berhad (“Thhe” Or The “Company”) - Letter Of Award From JX Nippon Oil & Gas Exploration (Malaysia) Limited(“JX Nippon”)
- Field Development Plan approved for Layang Field of Block SK10 offshore Sarawak, Malaysia
- Sapurakencana Petroleum Bags 5 New Contracts Worth Rm 1 Billion (US$312 Million)
- Technip awarded an important flexible pipe contract for the Layang Development