Lancelot Complex Gas Fields
Jump to navigation
Jump to search
Summary Information
- Operator: Perenco
- Country: UK
- Location: Southern North Sea
- Production start: 1993
- Partners: Hansa
- Type: Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The complex is made up of **Lancelot**, **Guinevere**, **Excalibur**, **Galahad** and **Malory** Fields
- Excalibur, Guinevere, Malory & Galahad utilise small unmanned platforms
- Production from the Lancelot Area Pipeline System (LAPS) catchment area is delivered through a dedicated pipeline and onshore compression facility to the Perenco Bacton gas processing facilities in Norfolk
+++ Contractors
- **McDermott-ETPM:** Lancelot/Guinevere & Galahad subsea
- **SLP Engineering:** Malory Platform Construction
- **Brown & Root:** Galahad platform Construction
- **Seaway Heavy Lifting:** T & I for Malory & Galahad Platforms
+++ History
- 1992 - Approval for Lancelot, Excalibur and Guinevere
- 1993 - Production commenced from Lancelot and Guinevere
- 1995 - Galahad production starts
- 1997 - Approval for Malory
- 1998 - Production started at Malory
- 2013 - Hansa Hydrocarbons acquires an interest in Lancelot, Malory and Guinevere
+++ Geology
+++ Links
- List Of Oil Production Platforms In The UK
- List Of Oil and Gas Production Platforms In The UK
- Seaway Heavy Lifting Oil And Gas References
- FoundOcean Europe Subsea References
- Serimax Pipeline References
- Hansa Hydrocarbons acquires Noble Energy’s interests in the LAPS area of the UK Southern North Sea