Lancelot Complex Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: Perenco
  • Country: UK
  • Location: Southern North Sea
  • Production start: 1993
  • Partners: Hansa
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The complex is made up of **Lancelot**, **Guinevere**, **Excalibur**, **Galahad** and **Malory** Fields
  • Excalibur, Guinevere, Malory & Galahad utilise small unmanned platforms
  • Production from the Lancelot Area Pipeline System (LAPS) catchment area is delivered through a dedicated pipeline and onshore compression facility to the Perenco Bacton gas processing facilities in Norfolk

+++ Contractors

  • **McDermott-ETPM:** Lancelot/Guinevere & Galahad subsea
  • **SLP Engineering:** Malory Platform Construction
  • **Brown & Root:** Galahad platform Construction
  • **Seaway Heavy Lifting:** T & I for Malory & Galahad Platforms

+++ History

  • 1992 - Approval for Lancelot, Excalibur and Guinevere
  • 1993 - Production commenced from Lancelot and Guinevere
  • 1995 - Galahad production starts
  • 1997 - Approval for Malory
  • 1998 - Production started at Malory
  • 2013 - Hansa Hydrocarbons acquires an interest in Lancelot, Malory and Guinevere

+++ Geology

+++ Links

  1. List Of Oil Production Platforms In The UK
  2. List Of Oil and Gas Production Platforms In The UK
  3. Seaway Heavy Lifting Oil And Gas References
  4. FoundOcean Europe Subsea References
  5. Serimax Pipeline References
  6. Hansa Hydrocarbons acquires Noble Energy’s interests in the LAPS area of the UK Southern North Sea