Difference between revisions of "Lancaster Oil Field"

From A Barrel Full
Jump to navigation Jump to search
Line 13: Line 13:
 
* It is the first basement reservoir development on the UK Continental Shelf, and sits in relatively shallow water of around 160 metres.  
 
* It is the first basement reservoir development on the UK Continental Shelf, and sits in relatively shallow water of around 160 metres.  
 
* The first phase of the development, the Early Production System (EPS), came on stream in June 2019.
 
* The first phase of the development, the Early Production System (EPS), came on stream in June 2019.
 +
* The EPS involves the intervention and completion of wells 205/21a-6 and 205/21a-7Z, which were drilled in 2014 and 2016 respectively, using an anchored semi-submersible drilling rig.
 +
* The subsea wells, which are approximately 25 metres (m) apart, are fitted with electro-submersible pumps to aid production, and with xmas trees with integrated protective structures.
 +
* The wells are connected to a floating production, storage and offloading(FPSO) vessel, the refurbished [[Aoka Mizu FPSO]], via a production manifold and two separate
 +
2.1 km flexible production flowlines. Produced oil is exported via shuttle tankers, and produced gas is used as fuel with excess gas flared.
  
 
=== Contractors ===
 
=== Contractors ===
Line 28: Line 32:
 
=== Links ===
 
=== Links ===
 
# [[UK Oil and Gas Fields by Approval Date]]
 
# [[UK Oil and Gas Fields by Approval Date]]
 +
# [https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/718334/D_4196_2017_Hurricane_Lancaster_.pdf Lancaster Field Early Production System]
 
# [https://abarrelfull.blogspot.com/2023/08/the-prax-group-announces-successful.html The Prax Group Announces Successful Acquisition Of Hurricane Energy Plc]
 
# [https://abarrelfull.blogspot.com/2023/08/the-prax-group-announces-successful.html The Prax Group Announces Successful Acquisition Of Hurricane Energy Plc]
  

Revision as of 16:54, 31 August 2023

Summary Information

  • Operator: Prax
  • Country: UK
  • Location: West of Shetland
  • Production start: 2019
  • Partners: Prax 100%
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Lancaster Field is located in blocks 205/21a, 205/22a and 205/26b, licence P1368 Central.
  • It is the first basement reservoir development on the UK Continental Shelf, and sits in relatively shallow water of around 160 metres.
  • The first phase of the development, the Early Production System (EPS), came on stream in June 2019.
  • The EPS involves the intervention and completion of wells 205/21a-6 and 205/21a-7Z, which were drilled in 2014 and 2016 respectively, using an anchored semi-submersible drilling rig.
  • The subsea wells, which are approximately 25 metres (m) apart, are fitted with electro-submersible pumps to aid production, and with xmas trees with integrated protective structures.
  • The wells are connected to a floating production, storage and offloading(FPSO) vessel, the refurbished Aoka Mizu FPSO, via a production manifold and two separate

2.1 km flexible production flowlines. Produced oil is exported via shuttle tankers, and produced gas is used as fuel with excess gas flared.

Contractors

  • -

History

  • 2009 - The Lancaster Field was discovered by Hurricane
  • 2017 - Approval granted for Lancaster field
  • 2019 - First oil
  • 2023 - Prax acquired Hurricane Energy