Laila Gas Field

From A Barrel Full
Revision as of 18:10, 21 February 2024 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Summary Information

  • Operator: Shell
  • Country: Malaysia
  • Location: SK 307
  • Production start:
  • Partners:
  • Type: Oil / Gas
  • Estimated Reserves:
  • Production Volume:

Description

Contractors

  • **Technip:** Pipelines
    • Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters,
    • Diver installation of riser clamps at both jacket platforms,
    • Pre-commissioning of the flowlines,
    • Project management.

History

Geology

Links

  1. Petrofac-RNZ Offshore and Platform References
  2. Technip awarded subsea contract for the Laila and D12 fields in Malaysia