Difference between revisions of "Laila Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 3: | Line 3: | ||
* Country: Malaysia | * Country: Malaysia | ||
* Location: SK 307 | * Location: SK 307 | ||
− | * Production start: | + | * Production start: 2014 |
* Partners: | * Partners: | ||
− | * Type: | + | * Type: Gas |
* Estimated Reserves: | * Estimated Reserves: | ||
* Production Volume: | * Production Volume: | ||
Line 21: | Line 21: | ||
=== History === | === History === | ||
* 2013 - Technip awarded subsea contract | * 2013 - Technip awarded subsea contract | ||
+ | * 2014 - First gas produced | ||
=== Geology === | === Geology === |
Latest revision as of 18:17, 21 February 2024
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: SK 307
- Production start: 2014
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field is located 140 kilometers offshore Bintulu, Malaysia, at a water depth of 50 meters
Contractors
- Technip: Pipelines
- Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters,
- Diver installation of riser clamps at both jacket platforms,
- Pre-commissioning of the flowlines,
- Project management.
History
- 2013 - Technip awarded subsea contract
- 2014 - First gas produced