Difference between revisions of "Laila Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 13: | Line 13: | ||
=== Contractors === | === Contractors === | ||
− | * | + | * '''Technip:''' Pipelines |
** Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters, | ** Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters, | ||
** Diver installation of riser clamps at both jacket platforms, | ** Diver installation of riser clamps at both jacket platforms, |
Revision as of 18:11, 21 February 2024
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: SK 307
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
Contractors
- Technip: Pipelines
- Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters,
- Diver installation of riser clamps at both jacket platforms,
- Pre-commissioning of the flowlines,
- Project management.