Difference between revisions of "Laila Gas Field"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Operator: Shell | * Operator: Shell | ||
* Country: Malaysia | * Country: Malaysia | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* | * | ||
− | + | === Contractors === | |
* **Technip:** Pipelines | * **Technip:** Pipelines | ||
** Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters, | ** Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters, | ||
Line 19: | Line 19: | ||
** Project management. | ** Project management. | ||
− | + | === History === | |
* | * | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
+ | # [[Petrofac-RNZ Offshore and Platform References]] | ||
# [http://killajoules.wikidot.com/blog:3841 Technip awarded subsea contract for the Laila and D12 fields in Malaysia] | # [http://killajoules.wikidot.com/blog:3841 Technip awarded subsea contract for the Laila and D12 fields in Malaysia] |
Revision as of 18:10, 21 February 2024
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: SK 307
- Production start:
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
Description
Contractors
- **Technip:** Pipelines
- Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters,
- Diver installation of riser clamps at both jacket platforms,
- Pre-commissioning of the flowlines,
- Project management.