Laila Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Shell
- Country: Malaysia
- Location: SK 307
- Production start: 2014
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The field is located 140 kilometers offshore Bintulu, Malaysia, at a water depth of 50 meters
Contractors
- Technip: Pipelines
- Design, fabrication and installation of a five-kilometer flexible pipe and a ten-kilometer flexible pipe respectively of 7” and 12.8” diameters,
- Diver installation of riser clamps at both jacket platforms,
- Pre-commissioning of the flowlines,
- Project management.
History
- 2013 - Technip awarded subsea contract
- 2014 - First gas produced