Difference between revisions of "LNG Terminal Projects to be Completed in 2026"

From A Barrel Full
Jump to navigation Jump to search
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
=== Introduction ===
 +
* We only expect a large number of new export terminals to enter operation in 2026, bringing as much as 90 million tons of capacity
  
 
+
==== Export Terminals ====
 +
# [[CP2 LNG Export Terminal Project]] - Phase 1
 
# [[Delfin LNG Export Terminal Project]]
 
# [[Delfin LNG Export Terminal Project]]
 
# [[Malaysia Sabah FLNG Terminal]]
 
# [[Malaysia Sabah FLNG Terminal]]
 
# [[Pluto LNG Terminal]] - Phase 2
 
# [[Pluto LNG Terminal]] - Phase 2
 +
# [[Rio Grande Export Terminal LNG Project]] - Phase 1
 +
# [[Sabine Pass LNG Terminal]] - Expansion
 +
# [[Shell British Columbia LNG Terminal]]
 +
 +
==== Import Terminals ====

Latest revision as of 14:56, 22 August 2023

Introduction

  • We only expect a large number of new export terminals to enter operation in 2026, bringing as much as 90 million tons of capacity

Export Terminals

  1. CP2 LNG Export Terminal Project - Phase 1
  2. Delfin LNG Export Terminal Project
  3. Malaysia Sabah FLNG Terminal
  4. Pluto LNG Terminal - Phase 2
  5. Rio Grande Export Terminal LNG Project - Phase 1
  6. Sabine Pass LNG Terminal - Expansion
  7. Shell British Columbia LNG Terminal

Import Terminals