Difference between revisions of "LNG Terminal Projects to be Completed in 2023"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 7: | Line 7: | ||
# Train one of the [[Arctic LNG Terminal]] will be completed | # Train one of the [[Arctic LNG Terminal]] will be completed | ||
# [[Greater Tortue FLNG Project]] | # [[Greater Tortue FLNG Project]] | ||
+ | # Phase I of the [[Marine XII Floating LNG Terminal]] | ||
==== Import Terminals ==== | ==== Import Terminals ==== |
Revision as of 09:47, 30 August 2022
Introduction
- Global liquefaction capacity will increase by about 20m tons
- Global regasification capacity will increase by about 40m tons
Export Terminals
- Train one of the Arctic LNG Terminal will be completed
- Greater Tortue FLNG Project
- Phase I of the Marine XII Floating LNG Terminal
Import Terminals
- Alexandroupolis LNG Terminal - Greece
- Chhara LNG Terminal - India
- Cyprus LNG Terminal - Cyprus
- First Gen Batangas LNG Terminal - Philippines
- Jiaxing LNG Terminal - China
- Longkou Nanshan LNG Terminal - China
- Port Kembla LNG Terminal Project - Australia
- São Paulo LNG Regasification Terminal - Brazil
- Snam Adriatic Floating LNG Terminal
- Snam North Floating LNG Terminal
- Wilhelmshaven Floating LNG Terminal - Germany
- Yantai Shandong LNG Terminal - China