LNG Terminal Projects Completed in 2021

From A Barrel Full
Revision as of 15:01, 22 August 2023 by Abarrelfull (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Introduction

  • Global Liquefaction capacity only increased by 9.0 million tons in 2021

Export Terminals

  1. Train three of Corpus Christi LNG Terminal
  2. Malaysia Dua FLNG Terminal
  3. Sabine Pass LNG Terminal - Phase 2
  4. Train four of Yamal LNG Terminal

Import Terminals

  1. Acajutla LNG Terminal - El Salvador
  2. Al Zour LNG Terminal - Kuwait
  3. Hrvatska LNG Terminal - Croatia
  4. Port of Açu LNG Terminal - Brazil