Difference between revisions of "LNG Terminal Projects Completed in 2021"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
=== Introduction === | === Introduction === | ||
− | + | * Global Liquefaction capacity only increased by 9.0 million tons in 2021 | |
==== Export Terminals ==== | ==== Export Terminals ==== | ||
+ | # Train three of [[Corpus Christi LNG Terminal]] | ||
+ | # [[Malaysia Dua FLNG Terminal]] | ||
+ | # [[Sabine Pass LNG Terminal]] - Phase 2 | ||
+ | # Train four of [[Yamal LNG Terminal]] | ||
==== Import Terminals ==== | ==== Import Terminals ==== | ||
+ | |||
+ | # [[Acajutla LNG Terminal]] - El Salvador | ||
# [[Al Zour LNG Terminal]] - Kuwait | # [[Al Zour LNG Terminal]] - Kuwait | ||
# [[Hrvatska LNG Terminal]] - Croatia | # [[Hrvatska LNG Terminal]] - Croatia | ||
+ | # [[Port of Açu LNG Terminal]] - Brazil |
Latest revision as of 15:01, 22 August 2023
Introduction
- Global Liquefaction capacity only increased by 9.0 million tons in 2021
Export Terminals
- Train three of Corpus Christi LNG Terminal
- Malaysia Dua FLNG Terminal
- Sabine Pass LNG Terminal - Phase 2
- Train four of Yamal LNG Terminal
Import Terminals
- Acajutla LNG Terminal - El Salvador
- Al Zour LNG Terminal - Kuwait
- Hrvatska LNG Terminal - Croatia
- Port of Açu LNG Terminal - Brazil