Difference between revisions of "LNG Terminal Projects Completed in 2021"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 6: | Line 6: | ||
# Train three of [[Corpus Christi LNG Terminal]] | # Train three of [[Corpus Christi LNG Terminal]] | ||
# [[Malaysia Dua FLNG Terminal]] | # [[Malaysia Dua FLNG Terminal]] | ||
+ | # Train four of [[Yamal LNG Terminal]] | ||
==== Import Terminals ==== | ==== Import Terminals ==== |
Revision as of 16:01, 21 December 2021
Introduction
- Global Liquefaction capacity only increased by 9.0 million tons in 2021
Export Terminals
- Train three of Corpus Christi LNG Terminal
- Malaysia Dua FLNG Terminal
- Train four of Yamal LNG Terminal
Import Terminals
- Al Zour LNG Terminal - Kuwait
- Hrvatska LNG Terminal - Croatia
- Port of Açu LNG Terminal - Brazil