LNG Terminal Projects Completed in 2019

From A Barrel Full
Jump to navigation Jump to search

Introduction

  • Global Liquefaction capacity increased by 23.0 million tons in 2019
  • Global Regasification capacity increased by 28.0 million tons in 2019

Export Terminals

  1. Cameron LNG Export Terminal Project
  2. The second train of Corpus Christi LNG Terminal
  3. Elba Island LNG Terminal
  4. Freeport LNG Terminal
  5. Prelude Floating LNG Terminal
  6. The fifth train of Sabine Pass LNG Terminal

Import Terminals

  1. Chennai LNG Terminal
  2. The third pahse of the Dahej LNG Terminal was completed
  3. Ennore LNG Terminal
  4. Kalingrad Floating LNG Terminal
  5. Summit LNG Terminal
  6. Phase 2 expansion of Taichung LNG Terminal