LNG Terminal Projects Completed in 2019
Introduction
- Global Liquefaction capacity increased by 23.0 million tons in 2019
Export Terminals
- Cameron LNG Export Terminal Project
- The second train of Corpus Christi LNG Terminal
- Elba Island LNG Terminal
- Freeport LNG Terminal
- Prelude Floating LNG Terminal
- The fifth train of Sabine Pass LNG Terminal
Import Terminals
- Chennai LNG Terminal
- The third pahse of the Dahej LNG Terminal was completed
- Kalingrad Floating LNG Terminal
- Maheshkhali LNG Terminal