Difference between revisions of "LNG Terminal Projects Completed in 2019"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 16: | Line 16: | ||
# The third pahse of the [[Dahej LNG Terminal]] was completed | # The third pahse of the [[Dahej LNG Terminal]] was completed | ||
# [[Kalingrad Floating LNG Terminal]] | # [[Kalingrad Floating LNG Terminal]] | ||
− | # [[ | + | # [[Summit LNG Terminal]] |
Revision as of 17:18, 17 January 2022
Introduction
- Global Liquefaction capacity increased by 23.0 million tons in 2019
Export Terminals
- Cameron LNG Export Terminal Project
- The second train of Corpus Christi LNG Terminal
- Elba Island LNG Terminal
- Freeport LNG Terminal
- Prelude Floating LNG Terminal
- The fifth train of Sabine Pass LNG Terminal
Import Terminals
- Chennai LNG Terminal
- The third pahse of the Dahej LNG Terminal was completed
- Kalingrad Floating LNG Terminal
- Summit LNG Terminal