Difference between revisions of "LNG Terminal Projects Completed in 2019"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Introduction === | === Introduction === | ||
− | * Global Liquefaction capacity increased by | + | * Global Liquefaction capacity increased by 23.0 million tons in 2019 |
=== Export Terminals === | === Export Terminals === |
Revision as of 11:27, 17 January 2022
Introduction
- Global Liquefaction capacity increased by 23.0 million tons in 2019
Export Terminals
- Cameron LNG Export Terminal Project
- Elba Island LNG Terminal
- Freeport LNG Terminal
- Prelude Floating LNG Terminal