Difference between revisions of "LNG Terminal Projects Completed in 2019"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 14: | Line 14: | ||
# [[Chennai LNG Terminal]] | # [[Chennai LNG Terminal]] | ||
− | # The | + | # The third pahse of the [[Dahej LNG Terminal]] was completed |
# [[Kalingrad Floating LNG Terminal]] | # [[Kalingrad Floating LNG Terminal]] | ||
+ | # [[Maheshkhali LNG Terminal]] |
Revision as of 17:00, 17 January 2022
Introduction
- Global Liquefaction capacity increased by 23.0 million tons in 2019
Export Terminals
- Cameron LNG Export Terminal Project
- The second train of Corpus Christi LNG Terminal
- Elba Island LNG Terminal
- Freeport LNG Terminal
- Prelude Floating LNG Terminal
- The fifth train of Sabine Pass LNG Terminal
Import Terminals
- Chennai LNG Terminal
- The third pahse of the Dahej LNG Terminal was completed
- Kalingrad Floating LNG Terminal
- Maheshkhali LNG Terminal