Difference between revisions of "LNG Terminal Projects Completed in 2019"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 5: | Line 5: | ||
# [[Cameron LNG Export Terminal Project]] | # [[Cameron LNG Export Terminal Project]] | ||
+ | # The second train of [[Corpus Christi LNG Terminal]] | ||
# [[Elba Island LNG Terminal]] | # [[Elba Island LNG Terminal]] | ||
# [[Freeport LNG Terminal]] | # [[Freeport LNG Terminal]] | ||
# [[Prelude Floating LNG Terminal]] | # [[Prelude Floating LNG Terminal]] | ||
+ | # The fifth train of [[Sabine Pass LNG Terminal]] | ||
=== Import Terminals === | === Import Terminals === | ||
# [[Kalingrad Floating LNG Terminal]] | # [[Kalingrad Floating LNG Terminal]] |
Revision as of 11:28, 17 January 2022
Introduction
- Global Liquefaction capacity increased by 23.0 million tons in 2019
Export Terminals
- Cameron LNG Export Terminal Project
- The second train of Corpus Christi LNG Terminal
- Elba Island LNG Terminal
- Freeport LNG Terminal
- Prelude Floating LNG Terminal
- The fifth train of Sabine Pass LNG Terminal