Difference between revisions of "LNG Terminal Projects Completed in 2018"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
=== Introduction === | === Introduction === | ||
− | * Global Liquefaction capacity increased by | + | * Global Liquefaction capacity increased by 55.0 million tons in 2018 |
* Global Regasification capacity increased by X million tons in 2018 | * Global Regasification capacity increased by X million tons in 2018 | ||
Revision as of 08:01, 27 June 2022
Introduction
- Global Liquefaction capacity increased by 55.0 million tons in 2018
- Global Regasification capacity increased by X million tons in 2018