Difference between revisions of "LNG Terminal Projects Completed in 2018"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
 
=== Introduction ===
 
=== Introduction ===
* Global Liquefaction capacity increased by X million tons in 2018
+
* Global Liquefaction capacity increased by 55.0 million tons in 2018
 
* Global Regasification capacity increased by X million tons in 2018
 
* Global Regasification capacity increased by X million tons in 2018
  

Revision as of 08:01, 27 June 2022

Introduction

  • Global Liquefaction capacity increased by 55.0 million tons in 2018
  • Global Regasification capacity increased by X million tons in 2018

Export Terminals

  1. Corpus Christi LNG Terminal
  2. Ichthys LNG Terminal
  3. Wheatstone LNG Terminal, second train

Import Terminals