Difference between revisions of "LNG Terminal Projects Completed in 2015"

From A Barrel Full
Jump to navigation Jump to search
 
Line 1: Line 1:
  
 
=== Introduction ===
 
=== Introduction ===
* Global Liquefaction capacity increased by X million tons in 2015
+
* Global Liquefaction capacity increased by 10.5 million tons in 2015
 
* Global Regasification capacity increased by X million tons in 2015
 
* Global Regasification capacity increased by X million tons in 2015
  

Latest revision as of 10:29, 27 June 2022

Introduction

  • Global Liquefaction capacity increased by 10.5 million tons in 2015
  • Global Regasification capacity increased by X million tons in 2015

Export Terminals

  1. Queensland Curtis LNG Terminal
  2. Donggi Senoro LNG Terminal

Import Terminals

  1. Shenzhen Diefu CNOOC LNG Terminal