LNG Terminal Projects Completed in 2014

From A Barrel Full
Revision as of 18:18, 18 February 2023 by Abarrelfull (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Introduction

  • Global Liquefaction capacity increased by X million tons in 2014
  • Global Regasification capacity increased by X million tons in 2014

Export Terminals

  1. The third train of Arzew LNG Terminal was commissioned
  2. Papua New Guinea LNG Terminal


Import Terminals

  1. Klaipeda LNG Terminal
  2. Shandong LNG Terminal