LNG Terminal Projects Completed in 2014

From A Barrel Full
Revision as of 10:40, 27 June 2022 by Abarrelfull (talk | contribs)
Jump to navigation Jump to search

Introduction

  • Global Liquefaction capacity increased by X million tons in 2014
  • Global Regasification capacity increased by X million tons in 2014

Export Terminals

  1. The third train of Arzew LNG Terminal was commissioned
  2. Papua New Guinea LNG Terminal


Import Terminals

  1. Shandong LNG Terminal