Difference between revisions of "LNG Terminal Projects Completed in 2014"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
+ | === Introduction === | ||
+ | * Global Liquefaction capacity increased by X million tons in 2014 | ||
+ | * Global Regasification capacity increased by X million tons in 2014 | ||
+ | === Export Terminals === | ||
+ | |||
+ | # The third train of [[Arzew LNG Terminal]] was commissioned | ||
# [[Papua New Guinea LNG Terminal]] | # [[Papua New Guinea LNG Terminal]] | ||
+ | |||
+ | |||
+ | === Import Terminals === | ||
# [[Shandong LNG Terminal]] | # [[Shandong LNG Terminal]] |
Revision as of 10:40, 27 June 2022
Introduction
- Global Liquefaction capacity increased by X million tons in 2014
- Global Regasification capacity increased by X million tons in 2014
Export Terminals
- The third train of Arzew LNG Terminal was commissioned
- Papua New Guinea LNG Terminal