Difference between revisions of "LNG Terminal Projects Completed in 2014"

From A Barrel Full
Jump to navigation Jump to search
Line 1: Line 1:
 +
=== Introduction ===
 +
* Global Liquefaction capacity increased by X million tons in 2014
 +
* Global Regasification capacity increased by X million tons in 2014
  
 +
=== Export Terminals ===
 +
 +
# The third train of [[Arzew LNG Terminal]] was commissioned
 
# [[Papua New Guinea LNG Terminal]]
 
# [[Papua New Guinea LNG Terminal]]
 +
 +
 +
=== Import Terminals ===
  
 
# [[Shandong LNG Terminal]]
 
# [[Shandong LNG Terminal]]

Revision as of 10:40, 27 June 2022

Introduction

  • Global Liquefaction capacity increased by X million tons in 2014
  • Global Regasification capacity increased by X million tons in 2014

Export Terminals

  1. The third train of Arzew LNG Terminal was commissioned
  2. Papua New Guinea LNG Terminal


Import Terminals

  1. Shandong LNG Terminal