Difference between revisions of "Knock Allan FPSO"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) (Created page with "Summary Information * Name: Knock Allan FPSO * Field: Olowi Oil Field * Country: Gabon * Ownership: Yinson * Website: http://www.yinson.com.my/ * Field Operated By: Canad...") |
Abarrelfull (talk | contribs) |
||
Line 30: | Line 30: | ||
* 2009 - First oil produced | * 2009 - First oil produced | ||
* 2013 - Yinson acquired the vessel from Fred Olsen | * 2013 - Yinson acquired the vessel from Fred Olsen | ||
+ | * 2018 - The vessel was removed from the Olowi field | ||
+++ Other Information | +++ Other Information | ||
Line 44: | Line 45: | ||
# [[Jotun FPSO References]] | # [[Jotun FPSO References]] | ||
# [http://killajoules.wikidot.com/archive:yinson-holdings-completes-fred-olsen-acquistion Yinson Holdings Completes Fred Olsen Acquistion] | # [http://killajoules.wikidot.com/archive:yinson-holdings-completes-fred-olsen-acquistion Yinson Holdings Completes Fred Olsen Acquistion] | ||
+ | # [https://abarrelfull.blogspot.com/2023/12/yinson-holdings-berhad-notice-of.html Yinson Holdings Berhad - Notice Of Termination - Contract For The FPSO for the Olowi Field] |
Latest revision as of 11:26, 2 December 2023
Summary Information
- Name: Knock Allan FPSO
- Field: Olowi Oil Field
- Country: Gabon
- Ownership: Yinson
- Website: http://www.yinson.com.my/
- Field Operated By: Canadian Natural Resources
- Capacity: 35,000 bpd
- Year of Completion:
+++ Brief Description
- The suezmax tanker Knock Allan was converted from a trading tanker to an FPSO at Dubai Drydocks
- The vessel has a capacity of 35,000 bpd and storage of 1.04 million barrels
+++ Contractors
- **Drydocks World:** FPSO conversion
- **Inocean:** Design
- **Allards:** Thermal design, mechanical design, engineering, expediting, procurement, fabrication, and testing and inspection of the four inlet heaters, together with the two interstage Heaters - shell and tube heat exchangers, for the Topsides
- **ABB:** Electrical Systems
- **Jotun:** Painting
+++ Status
- In operation
+++ History
- 2006 - Fred. Olsen awarded conversion contract
- 2009 - First oil produced
- 2013 - Yinson acquired the vessel from Fred Olsen
- 2018 - The vessel was removed from the Olowi field
+++ Other Information
- -
+++ Links