Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: EnQuest * Country: UK * Location: * Production start: 1990 * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++ D...") |
Abarrelfull (talk | contribs) |
||
Line 12: | Line 12: | ||
* The Kittiwake platform has an oil capacity of 29,000 Boepd and a water injection capacity of 57,000 Boepd. Water depth of 85-90m. | * The Kittiwake platform has an oil capacity of 29,000 Boepd and a water injection capacity of 57,000 Boepd. Water depth of 85-90m. | ||
* A number of satellite fields are connected via subsea tiebacks including [[Goosander Oil Field]], [[Grouse Oil Field]], [[Mallard Oil Field]] & [[Gadwall Oil Field]] | * A number of satellite fields are connected via subsea tiebacks including [[Goosander Oil Field]], [[Grouse Oil Field]], [[Mallard Oil Field]] & [[Gadwall Oil Field]] | ||
+ | * The [[Scolty and Crathes Oil and Gas Fields}]] are the latest tie backs to Kittiwake | ||
* Oil is exported via a 33 km 10” pipeline to the Forties Unity platform and then to shore at Cruden Bay via the [[Forties Pipeline System]] | * Oil is exported via a 33 km 10” pipeline to the Forties Unity platform and then to shore at Cruden Bay via the [[Forties Pipeline System]] | ||
Revision as of 07:30, 31 August 2023
Summary Information
- Operator: EnQuest
- Country: UK
- Location:
- Production start: 1990
- Partners:
- Type: Oil / Gas
- Estimated Reserves:
- Production Volume:
+++ Description
- The Kittiwake platform has an oil capacity of 29,000 Boepd and a water injection capacity of 57,000 Boepd. Water depth of 85-90m.
- A number of satellite fields are connected via subsea tiebacks including Goosander Oil Field, Grouse Oil Field, Mallard Oil Field & Gadwall Oil Field
- The [[Scolty and Crathes Oil and Gas Fields}]] are the latest tie backs to Kittiwake
- Oil is exported via a 33 km 10” pipeline to the Forties Unity platform and then to shore at Cruden Bay via the Forties Pipeline System
+++ Contractors
- **RGC Offshore:** Platform Construction
- **McDermott:** Installation
+++ History
- 1987 - Field development approved by government
- 1990 - First production
- 2007 - The Kittiwake pipeline was commissioned
- 2013 - EnQuest acquires 50% of the Greater Kittiwake Area