Kelvin Gas Field

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: ConocoPhillips
  • Country: UK
  • Location: Southern North Sea
  • Production start: 2007
  • Partners: GDF Suez, Tullow
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

+++ Contractors

  • **Heerema Marine Contractors:** Platform Construction
  • **KWSubsea:** Design of Kelvin Pigging Manifold Assembly
  • **Global Maritime:** Warranty surveyor for installation of flowline and subsea manifolds

+++ History

  • 2005 - Kelvin Gas Field discovered
  • 2007 - Project development approved by UK Government
  • 2007 - First gas produced

+++ Geology

+++ Links

  1. KWSubsea Subsea References
  2. FoundOcean Subsea References
  3. Global Maritime Pipeline References
  4. Tullow - International Activity Update