Difference between revisions of "Kazakhstan IPCI Petrochemical Project"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 10: | Line 10: | ||
=== Contractors === | === Contractors === | ||
− | Hualu Engineering & Technology Co: Construction | + | * Hualu Engineering & Technology Co: Construction |
− | CB&I: process licences | + | * CB&I: process licences |
=== History === | === History === |
Revision as of 15:31, 20 October 2020
Summary Information
- Owner: KPI (Kazakhstan Petrochemical Industries)
- Website: https://www.kpi.kz/en/
- Location: Aytaru, Kazakhstan
- Completion: 2022 expected
Project Details
- The first phase of the complex involves a 500 ktpa propylene plant and a 500 ktpa polypropylene plant. The PDH unit uses CB&I's CATOFIN® propane dehydrogenation technology, and the polypropylene plant uses CB&I's Novolen® advanced gas-phase polypropylene technology.
- The second phase will add an ethane cracker and polyethylene production
Contractors
- Hualu Engineering & Technology Co: Construction
- CB&I: process licences
History
2013 – Petrofac consortium awarded EPC contract 2017 – CB&I awarded process licences 2017 – Ground breaking ceremony
Links
Petrofac Consortium Appointed by KLPE LLP (KLPE) for Integrated Petrochemical Project in Kazakhstan CB&I Receives Full Notice to Proceed for Petrochemical Plant in Kazakhstan The Groundbreaking Ceremony of IPCI project in Kazakhstan Propane-propylene splitter of the PDH Plant in Kazakhstan IPCI Project Successfully Lifted in Place