Summary Information

  • Operator: ConocoPhillips
  • Country: UK
  • Location: Southern North Sea
  • Production start: 2013
  • Partners: GDF Suez, Tullow
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Katy Field development will consist of a single production well, the installation of a Normally Unattended Installation (NUI), the installation of two subsea protection structures (a Tee assembly at Katy and a pigging manifold at Kelvin) and a new 14 km 10” gas production pipeline with a piggy-backed 2” methanol pipeline.
  • The pipeline will connect the Katy platform to the existing Kelvin Subsea Tee, which is tied-back to the Murdoch Complex.
  • Commingled gas from Katy and other connected fields will be exported from the [[[Murdoch Gas Field | Murdoch Complex]]] to the Theddlethorpe Gas Terminal via the CMS pipeline system.

+++ Contractors

  • **Wilton Engineering:** Fabrication of all subsea structures, including the two large structures: a 59-tonne tee and a 73-tonne pigging manifold
  • **Seaway Heavy Lifting:** Transportation & Installation of Jacket & Piles and Topsides
  • **KWSubsea:** Detailed design of 14km 10" gas production and 2" methanol piggyback pipelines, associated tie-in spoolpieces, 100T Kelvin Pigging Manifold Assembly and Katy Future 60T Tie-in Assembly
  • **Nessco:** Communications Systems

+++ History

  • 2012 - Project development approved by UK Government
  • 2013 - First gas produced

+++ Geology

+++ Links

  1. UK Oil and Gas Fields by Approval Date
  2. Seaway Heavy Lifting Oil And Gas References
  3. KWSubsea Subsea References
  4. Nessco Platform References
  5. Wilton Engineering Completes Saipem Contract