Katarina Gas Field

From A Barrel Full
Revision as of 11:28, 28 December 2022 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Operator: ENI * Country: Croatia * Location: Adriatic * Production start: 2006 * Partners: ENI - 50%, INA - 50% * Type: Gas * Estimated Reserves: * Pr...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Summary Information

  • Operator: ENI
  • Country: Croatia
  • Location: Adriatic
  • Production start: 2006
  • Partners: ENI - 50%, INA - 50%
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The field consists of a single manned production platform

+++ Contractors

  • **Rosetti Marino:** Detail design, Engineering, Procurement, Fabrication, On-shore Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Offshore Commissioning, Assistance to Start up.
  • **Viktor Lenac:** Gas production platform
  • **Saipem:** Katarina platform concept definition - Basic Engineering
  • **Micoperi:** Katarina Jacket/Deck Installation
  • **FoundOcean:** Grouting

+++ History

  • 2002 - ENI signed an agreement for the development of the field
  • 2006 - Platform installed

+++ Geology

+++ Links

  1. Rosetti Marino Platform References
  2. Tecon Platform References
  3. Micoperi Offshore And Platform References
  4. Saipem Fixed Offshore Production Facilities Engineering Refe
  5. FoundOcean Europe Subsea References
  6. Viktor Lenac Platform References
  7. Eni: Start Up Of The Gas Fields In The Offshore of Croatia With Reserves Of 20 Billion Cubic Meters