Karaikal LNG Terminal
Revision as of 12:31, 6 January 2022 by Abarrelfull (talk | contribs) (Created page with "=== Summary Information === * Ownership: * Website: * Location: * Capacity: million tons/annum * Status: === Brief Description === * The project involves a permanently mo...")
Contents
Summary Information
- Ownership:
- Website:
- Location:
- Capacity: million tons/annum
- Status:
Brief Description
- The project involves a permanently moored FSU (Floating Storage Unit) inside the breakwater at the terminal and will store the LNG
- The re-gasification facility will be developed on shore through 125 mmcfd re-gas modules
- The re-gasified gas will be pumped through the GAIL Cauvery Basin Natural Gas Pipeline to customers
Technical Details
- Storage capacity:
- Unloading capacity:
- Send out capacity:
- Constructor:
Ongoing Projects/Project Status
Suppliers / Customers
- Suppliers:
- Customers:
History
- 200X -
Other Information
-