Difference between revisions of "Kaombo Twin FPSOs"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
* Name: Kaombo Norte and Kaombo Sul | * Name: Kaombo Norte and Kaombo Sul | ||
Line 10: | Line 10: | ||
* Year of Completion: | * Year of Completion: | ||
− | + | === Brief Description === | |
* The two converted FPSO units, will each have an oil treating capacity of 115,000 barrels per day, a water injection capacity of 200,000 barrels per day, a 100 million scfd gas compression capacity and a storage capacity of 1.7 million barrels of oil. | * The two converted FPSO units, will each have an oil treating capacity of 115,000 barrels per day, a water injection capacity of 200,000 barrels per day, a 100 million scfd gas compression capacity and a storage capacity of 1.7 million barrels of oil. | ||
* The vessels being converted are the VLCC, Olympia and VLCC, Antartica | * The vessels being converted are the VLCC, Olympia and VLCC, Antartica | ||
− | + | === Contractors === | |
* **Saipem:** | * **Saipem:** | ||
** Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems | ** Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems | ||
Line 24: | Line 24: | ||
* **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages | * **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages | ||
− | + | === Status === | |
− | * | + | * In operation |
− | + | === History === | |
* 2014 - Saipem awarded engineering, procurement, installation and commissioning contract | * 2014 - Saipem awarded engineering, procurement, installation and commissioning contract | ||
+ | * 2018 - | ||
+ | * 2019 - Kaombo Sul came onstream | ||
− | + | === Other Information === | |
* - | * - | ||
− | + | === Links === | |
# [http://killajoules.wikidot.com/blog:5111 Saipem: awarded FPSO contracts in Angola worth more than $4 billion] | # [http://killajoules.wikidot.com/blog:5111 Saipem: awarded FPSO contracts in Angola worth more than $4 billion] | ||
# [http://killajoules.wikidot.com/blog:5328 Sembcorp Marine's Sembawang Shipyard Secures Contract Worth About S$600 Million From Saipem SA for the Conversion of Two FPSOs] | # [http://killajoules.wikidot.com/blog:5328 Sembcorp Marine's Sembawang Shipyard Secures Contract Worth About S$600 Million From Saipem SA for the Conversion of Two FPSOs] | ||
# [http://killajoules.wikidot.com/blog:5946 Awarded FPSO Produced Water Treatment Packages] | # [http://killajoules.wikidot.com/blog:5946 Awarded FPSO Produced Water Treatment Packages] | ||
+ | # [https://abarrelfull.blogspot.com/2023/01/angola-total-launches-full-field.html Angola: Total launches full-field production on Kaombo with the start-up of the second FPSO] |
Revision as of 22:15, 23 January 2023
Contents
Summary Information
- Name: Kaombo Norte and Kaombo Sul
- Field: Kaombo Oil and Gas Fields
- Country: Angola
- Ownership: Total
- Website:
- Field Operated By:
- Capacity: 115,000 bpd
- Year of Completion:
Brief Description
- The two converted FPSO units, will each have an oil treating capacity of 115,000 barrels per day, a water injection capacity of 200,000 barrels per day, a 100 million scfd gas compression capacity and a storage capacity of 1.7 million barrels of oil.
- The vessels being converted are the VLCC, Olympia and VLCC, Antartica
Contractors
- **Saipem:**
- Engineering, procurement, conversion of the tankers, fabrication and integration of the topsides of the FPSO units and the installation of the mooring systems
- Hook-up, commissioning and operations start-up
- Seven years of operation and maintenance services for the FPSO units.
- **Sembawang Shipyard:**
- Refurbishment of the VLCCs, construction engineering, the fabrication of flare, helideck, upper turret and access structure, integration of the topsides modules, lower turret components, and pre-commissioning of the FPSOs
- **Alderley:** Design, engineer and fabricate Produced Water Treatment Packages
Status
- In operation
History
- 2014 - Saipem awarded engineering, procurement, installation and commissioning contract
- 2018 -
- 2019 - Kaombo Sul came onstream
Other Information
- -
Links
- Saipem: awarded FPSO contracts in Angola worth more than $4 billion
- Sembcorp Marine's Sembawang Shipyard Secures Contract Worth About S$600 Million From Saipem SA for the Conversion of Two FPSOs
- Awarded FPSO Produced Water Treatment Packages
- Angola: Total launches full-field production on Kaombo with the start-up of the second FPSO