Difference between revisions of "K15 Gas Fields"

From A Barrel Full
Jump to navigation Jump to search
(Created page with "Summary Information * Operator: NAM * Country: Netherlands * Location: * Production start: 1977 * Partners: * Type: Gas * Estimated Reserves: * Production Volume: +++ D...")
 
 
Line 10: Line 10:
  
 
+++ Description
 
+++ Description
* These fields are part of the [[[Netherlands Joint Development Area Gas Fields]]]
+
* These fields are part of the [[Netherlands Joint Development Area Gas Fields]]
 
* The development consists of 5 platforms:
 
* The development consists of 5 platforms:
 
** K15-FB-1 & K15-FA-1 integrated platforms
 
** K15-FB-1 & K15-FA-1 integrated platforms

Latest revision as of 12:42, 14 February 2024

Summary Information

  • Operator: NAM
  • Country: Netherlands
  • Location:
  • Production start: 1977
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description


+++ Contractors

  • **Saipem:** Installation of sealine from Platform K15 FB to Challantsoog
  • **ETPM:** K15-FC-1 installation

+++ History

  • 1977 - Production launched
  • 1989 - First satellite platform installed
  • 2002 - K15-FK-1 satellite platform added
  • 2011 - Talisman acquires a share from Vattenfall

+++ Geology

+++ Links

  1. Platforms Netherlands Continental Shelf
  2. Saipem Pipeline References
  3. Serimax Pipeline References
  4. Tullow to enhance Dutch portfolio through acquisition of Nuon E&P