K15 Gas Fields

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Operator: NAM
  • Country: Netherlands
  • Location:
  • Production start: 1977
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description


+++ Contractors

  • **Saipem:** Installation of sealine from Platform K15 FB to Challantsoog
  • **ETPM:** K15-FC-1 installation

+++ History

  • 1977 - Production launched
  • 1989 - First satellite platform installed
  • 2002 - K15-FK-1 satellite platform added
  • 2011 - Talisman acquires a share from Vattenfall

+++ Geology

+++ Links

  1. Platforms Netherlands Continental Shelf
  2. Saipem Pipeline References
  3. Serimax Pipeline References
  4. Tullow to enhance Dutch portfolio through acquisition of Nuon E&P