* Country: Trinidad and Tobago | * Country: Trinidad and Tobago | ||
* Location: 50 miles off the south east coast of Trinidad | * Location: 50 miles off the south east coast of Trinidad | ||
− | * Production start: | + | * Production start: 2017 |
* Partners: | * Partners: | ||
* Type: Gas | * Type: Gas | ||
Line 18: | Line 18: | ||
* Cypre will include seven wells and subsea trees tied back into the existing Juniper platform via two new 14 kilometre flexible flowlines. | * Cypre will include seven wells and subsea trees tied back into the existing Juniper platform via two new 14 kilometre flexible flowlines. | ||
* At its peak, the development is expected to deliver average gas production of 250-300 million standard cubic feet a day (mmscfd). | * At its peak, the development is expected to deliver average gas production of 250-300 million standard cubic feet a day (mmscfd). | ||
+ | ==== Matapal ==== | ||
+ | * The Matapal project developed the gas resources discovered by BPTT in 2017 with the Savannah exploration well. The project is a three-well subsea tie-back to the Juniper platform | ||
=== Contractors === | === Contractors === | ||
− | * Technip: design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools | + | * '''Technip:''' design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools |
− | * Gulf Marine Fabricators: Construction of the jacket and piles | + | * '''Gulf Marine Fabricators:''' Construction of the jacket and piles |
− | * TOFCO: Construction of the platform topsides | + | * '''TOFCO:''' Construction of the platform topsides |
==== Cypre ==== | ==== Cypre ==== | ||
− | * Subsea 7: concept and design, engineering, procurement, construction and installation of a two-phase liquid natural gas tieback to the Juniper platform through dual flexible flowlines and a manifold gathering system, along with topside upgrades. | + | * '''Subsea 7:''' concept and design, engineering, procurement, construction and installation of a two-phase liquid natural gas tieback to the Juniper platform through dual flexible flowlines and a manifold gathering system, along with topside upgrades. |
=== History === | === History === | ||
Line 30: | Line 32: | ||
* 2014 - Final investment decision made | * 2014 - Final investment decision made | ||
* 2017 - First gas produced | * 2017 - First gas produced | ||
− | * 2022 | + | * 2018 - FID for the Matapal Compression project |
+ | * 2022 - FID for Cypre development | ||
=== Geology === | === Geology === | ||
Line 40: | Line 43: | ||
# [https://abarrelfull.blogspot.com/2022/11/bps-juniper-platform-sets-sail-for.html BP’s Juniper platform sets sail for offshore Trinidad] | # [https://abarrelfull.blogspot.com/2022/11/bps-juniper-platform-sets-sail-for.html BP’s Juniper platform sets sail for offshore Trinidad] | ||
# [https://abarrelfull.blogspot.com/2022/11/bp-begins-production-from-juniper.html BP begins production from Juniper project in Trinidad] | # [https://abarrelfull.blogspot.com/2022/11/bp-begins-production-from-juniper.html BP begins production from Juniper project in Trinidad] | ||
+ | # [https://abarrelfull.blogspot.com/2024/02/bp-announces-sanction-of-cassia.html BP announces sanction of Cassia Compression and Matapal gas projects in Trinidad] | ||
# [https://abarrelfull.blogspot.com/2022/11/cypre-project-gets-go-ahead.html Cypre project gets go ahead] | # [https://abarrelfull.blogspot.com/2022/11/cypre-project-gets-go-ahead.html Cypre project gets go ahead] | ||
# [https://a-barrel-full.blogspot.com/2022/11/subsea7-awarded-contract-offshore.html Subsea7 awarded contract offshore Trinidad and Tobago] | # [https://a-barrel-full.blogspot.com/2022/11/subsea7-awarded-contract-offshore.html Subsea7 awarded contract offshore Trinidad and Tobago] |
Revision as of 08:16, 21 February 2024
Contents
Summary Information
- Operator: BP
- Country: Trinidad and Tobago
- Location: 50 miles off the south east coast of Trinidad
- Production start: 2017
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume: 590 million standard cubic feet a day (mmscfd) - est.
Description
- The Juniper facility takes gas from the **Corallita** and **Lantana** fields located 50 miles off the south east coast of Trinidad in water-depth of approximately 360 feet
- The development consists of a normally unmanned platform together with corresponding subsea infrastructure
- It includes five subsea wells and has a production capacity of approximately 590 million standard cubic feet a day (mmscfd).
- Gas from Juniper flows to the Mahogany B hub via a ten kilometre flowline
Cypre
- The Cypre gas field is located 78 kilometres off the southeast coast of Trinidad within the East Mayaro Block, in water depth of approximately 80 metres.
- Cypre will include seven wells and subsea trees tied back into the existing Juniper platform via two new 14 kilometre flexible flowlines.
- At its peak, the development is expected to deliver average gas production of 250-300 million standard cubic feet a day (mmscfd).
Matapal
- The Matapal project developed the gas resources discovered by BPTT in 2017 with the Savannah exploration well. The project is a three-well subsea tie-back to the Juniper platform
Contractors
- Technip: design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools
- Gulf Marine Fabricators: Construction of the jacket and piles
- TOFCO: Construction of the platform topsides
Cypre
- Subsea 7: concept and design, engineering, procurement, construction and installation of a two-phase liquid natural gas tieback to the Juniper platform through dual flexible flowlines and a manifold gathering system, along with topside upgrades.
History
- 2012 - Front End Engineering and Design (FEED) launched
- 2014 - Final investment decision made
- 2017 - First gas produced
- 2018 - FID for the Matapal Compression project
- 2022 - FID for Cypre development
Geology
Links
- BPTT ‘s Juniper Project Gets go Ahead
- Technip awarded a substantial EPIC contract for the Juniper field offshore Trinidad
- BP’s Juniper platform sets sail for offshore Trinidad
- BP begins production from Juniper project in Trinidad
- BP announces sanction of Cassia Compression and Matapal gas projects in Trinidad
- Cypre project gets go ahead
- Subsea7 awarded contract offshore Trinidad and Tobago