Difference between revisions of "Juniper Offshore Gas Fields"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) |
||
Line 28: | Line 28: | ||
# [http://killajoules.wikidot.com/blog:5369 BPTT ‘s Juniper Project Gets go Ahead] | # [http://killajoules.wikidot.com/blog:5369 BPTT ‘s Juniper Project Gets go Ahead] | ||
# [http://killajoules.wikidot.com/blog:5420 Technip awarded a substantial EPIC contract for the Juniper field offshore Trinidad] | # [http://killajoules.wikidot.com/blog:5420 Technip awarded a substantial EPIC contract for the Juniper field offshore Trinidad] | ||
+ | # [https://abarrelfull.blogspot.com/2022/11/cypre-project-gets-go-ahead.html Cypre project gets go ahead] |
Revision as of 14:42, 19 November 2022
Summary Information
- Operator: BP
- Country: Trinidad and Tobago
- Location: 50 miles off the south east coast of Trinidad
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume: 590 million standard cubic feet a day (mmscfd) - est.
Description
- The Juniper facility will take gas from the **Corallita** and **Lantana** fields located 50 miles off the south east coast of Trinidad in water-depth of approximately 360 feet
- The development will consist of a normally unmanned platform together with corresponding subsea infrastructure
- It will include five subsea wells and will have a production capacity of approximately 590 million standard cubic feet a day (mmscfd).
- Gas from Juniper will flow to the Mahogany B hub via a new ten kilometer flowline
Contractors
- **Technip:** design, detailed engineering, procurement, construction, load out and mechanical completion of topsides, jacket, flowlines, subsea structures and tie-in spools
History
- 2012 - Front End Engineering and Design (FEED) launched
- 2014 - Final investment decision made