Difference between revisions of "Jizan Refinery Project"
Abarrelfull (talk | contribs) (Created page with "Summary Information The refinery project is also known as Jazan Refinery Project Ownership: Saudi Aramco Website: http://www.saudiaramco.com/ List of Saudi Aramco Refineries W...") |
Abarrelfull (talk | contribs) |
||
Line 1: | Line 1: | ||
− | Summary Information | + | === Summary Information === |
The refinery project is also known as Jazan Refinery Project | The refinery project is also known as Jazan Refinery Project | ||
Ownership: Saudi Aramco | Ownership: Saudi Aramco | ||
Line 11: | Line 11: | ||
Expected Completion: 2017 | Expected Completion: 2017 | ||
Budget: $7.0 Billion | Budget: $7.0 Billion | ||
− | The Project | + | === The Project === |
Project Type: Greenfield Hydroskimming Refinery | Project Type: Greenfield Hydroskimming Refinery | ||
Project Summary: | Project Summary: | ||
Line 20: | Line 20: | ||
Petrofac: Two engineering, procurement and construction (EPC) packages for the tank farms | Petrofac: Two engineering, procurement and construction (EPC) packages for the tank farms | ||
CBI: Subcontractor for the Tanks Farms | CBI: Subcontractor for the Tanks Farms | ||
− | Refining Units | + | === Refining Units === |
Atmospheric Distillation | Atmospheric Distillation | ||
Hydrocracker | Hydrocracker | ||
Diesel hydrotreater | Diesel hydrotreater | ||
− | Terminal Capacity | + | === Terminal Capacity === |
Crude Oil: | Crude Oil: | ||
Refined Products: | Refined Products: | ||
− | Crude Supply | + | === Crude Supply === |
The refinery will process Arabian Heavy and Arabian Medium crudes | The refinery will process Arabian Heavy and Arabian Medium crudes | ||
− | Products Produced | + | === Products Produced === |
The refinery will manufacture approximately 75,000 bpd of gasoline, 100,000-160,000 bpd of ultra-low-sulfur diesel (10 parts per million), and 160,000-220,000 bpd of fuel oil | The refinery will manufacture approximately 75,000 bpd of gasoline, 100,000-160,000 bpd of ultra-low-sulfur diesel (10 parts per million), and 160,000-220,000 bpd of fuel oil | ||
− | History | + | === History === |
2011 - KBR was awarded a contract by Saudi Aramco to provide front-end engineering and design (FEED), and Project Management Services (PMS). | 2011 - KBR was awarded a contract by Saudi Aramco to provide front-end engineering and design (FEED), and Project Management Services (PMS). | ||
2012 - Saudi Aramco, signed contracts with the representatives of eight local and international construction and procurement companies | 2012 - Saudi Aramco, signed contracts with the representatives of eight local and international construction and procurement companies | ||
Line 37: | Line 37: | ||
Other Information | Other Information | ||
- | - | ||
− | + | === Links === | |
− | Jizan Refinery and Terminal | + | |
− | Aramco releases tender for USD 7 billion Jizan Refinery | + | # [http://www.saudiaramco.com/irj/portal/anonymous?favlnk=%2FSaudiAramcoPublic%2Fdocs%2FOur+Business%2FRefining+%26+Distribution&ln=en Jizan Refinery and Terminal] |
− | Alderley supply metering systems – Jazan Refinery Project | + | # [http://www.steelguru.com/middle_east_news/Aramco_releases_tender_for_USD_7_billion_Jizan_Refinery/180756.html Aramco releases tender for USD 7 billion Jizan Refinery] |
− | KBR Awarded FEED and Project Management Services Contract by Saudi Aramco for the Jazan Refinery and Marine Terminal Project | + | # [http://killajoules.wikidot.com/archive:alderley-supply-metering-systems-jazan-refinery-proj Alderley supply metering systems – Jazan Refinery Project] |
− | Jazan Project contracts signing | + | # [http://killajoules.wikidot.com/blog:497 KBR Awarded FEED and Project Management Services Contract by Saudi Aramco for the Jazan Refinery and Marine Terminal Project] |
− | Saudi Aramco selected Técnicas Reunidas for two major refining projects in Saudi Arabia | + | # [http://killajoules.wikidot.com/blog:3402 Jazan Project contracts signing] |
− | Petrofac Awarded Two Contracts at Jazan | + | # [http://killajoules.wikidot.com/blog:3403 Saudi Aramco selected Técnicas Reunidas for two major refining projects in Saudi Arabia] |
− | CB&I Awarded Sphere Storage Contract By Petrofac | + | # [http://killajoules.wikidot.com/blog:3492 Petrofac Awarded Two Contracts at Jazan] |
+ | # [http://killajoules.wikidot.com/blog:5316 CB&I Awarded Sphere Storage Contract By Petrofac] |
Revision as of 10:09, 20 October 2020
Contents
Summary Information
The refinery project is also known as Jazan Refinery Project Ownership: Saudi Aramco Website: http://www.saudiaramco.com/ List of Saudi Aramco Refineries Wiki Page: Jizan Refinery Location: Jazan, Saudi Arabia Capacity: 20.0 million tons/annum & 400,000 bbl/day Nelson Complexity: Project Stage: Planning Expected Completion: 2017 Budget: $7.0 Billion
The Project
Project Type: Greenfield Hydroskimming Refinery Project Summary: Main Contractors: KBR will provide FEED and PMS services to develop the process design, layout, integration and optimization of the facility, develop equipment and material specifications, prepare EPC bid packages and develop an estimate for the construction of the refinery. Technicas Reunidas: Execution of the hydrocracker and diesel hydrotreater facilities under two different contracts for the engineering, supply of the equipment and materials, construction of the plants, precommissioning and providing support during commissioning of the units Al-'Ali Al-Ajmi Group, Petrofac Saudi Arabia Ltd., Hyundai Saudi Arabia Ltd., Hanwa Engineering & Construction Corporation, GGC Corporation, Hitachi Plant Technologies Ltd., SK Engineering & Construction Petrofac: Two engineering, procurement and construction (EPC) packages for the tank farms CBI: Subcontractor for the Tanks Farms
Refining Units
Atmospheric Distillation Hydrocracker Diesel hydrotreater
Terminal Capacity
Crude Oil: Refined Products:
Crude Supply
The refinery will process Arabian Heavy and Arabian Medium crudes
Products Produced
The refinery will manufacture approximately 75,000 bpd of gasoline, 100,000-160,000 bpd of ultra-low-sulfur diesel (10 parts per million), and 160,000-220,000 bpd of fuel oil
History
2011 - KBR was awarded a contract by Saudi Aramco to provide front-end engineering and design (FEED), and Project Management Services (PMS). 2012 - Saudi Aramco, signed contracts with the representatives of eight local and international construction and procurement companies 2014 - CBI awarded LPG tank contract Other Information -
Links
- Jizan Refinery and Terminal
- Aramco releases tender for USD 7 billion Jizan Refinery
- Alderley supply metering systems – Jazan Refinery Project
- KBR Awarded FEED and Project Management Services Contract by Saudi Aramco for the Jazan Refinery and Marine Terminal Project
- Jazan Project contracts signing
- Saudi Aramco selected Técnicas Reunidas for two major refining projects in Saudi Arabia
- Petrofac Awarded Two Contracts at Jazan
- CB&I Awarded Sphere Storage Contract By Petrofac