Difference between revisions of "Jiaxing LNG Terminal"
Jump to navigation
Jump to search
Abarrelfull (talk | contribs) |
Abarrelfull (talk | contribs) (→Links) |
||
Line 39: | Line 39: | ||
- | - | ||
=== Links === | === Links === | ||
+ | # [http://www.halcrowgroup.com/Projects/152901874663.html Halcrow Group] | ||
# [https://lng-news.blogspot.com/2022/01/pavilion-energy-inks-deal-to-supply.html Pavilion Energy Inks Deal to Supply Small-Scale LNG to Hangjiaxin] | # [https://lng-news.blogspot.com/2022/01/pavilion-energy-inks-deal-to-supply.html Pavilion Energy Inks Deal to Supply Small-Scale LNG to Hangjiaxin] | ||
# [https://abarrelfull.blogspot.com/2022/01/saibu-gas-signed-hoa-with-novatek-on.html Saibu Gas signed HOA with Novatek on LNG Transshipment Project] | # [https://abarrelfull.blogspot.com/2022/01/saibu-gas-signed-hoa-with-novatek-on.html Saibu Gas signed HOA with Novatek on LNG Transshipment Project] |
Latest revision as of 09:30, 7 January 2022
Contents
Summary Information
- Ownership: Hangjiaxin (Jiaxing Gas/Hangzhou Gas)
- Website:
- Location: Zhejiang, China
- Capacity: 1.0 million tons/annum
- Status: Under construction
Brief Description
- A small scale onshore LNG terminal
- The design capability is 1 million tons per annum (mtpa), with regasification capacity of 0.6 mtpa and LNG truck export capacity of 0.4 mtpa.
Technical Details
- Storage capacity: 2x 100,000 m3 tanks
- Unloading capacity:
- Send out capacity:
- Constructor:
- HalcrowSea: Evaluate the proposed LNG sites & prepare EPC Tender Documents
Ongoing Projects/Project Status
- Under construction
- Commissioning is scheduled for 2023
Suppliers / Customers
- Suppliers:
- Pavilion Energy will supply 0.5 mtpa from 2023
- Saibu gas will supply 0.14 mtpa from Novatek
- Customers: The terminal will supply the local grid
History
- 2021 - Hangjiaxin signs agreement with Novatak and Saibu Gas for LNG Transhipment
- 2021 - Hangjiaxin and Pavilion Energy sign LNG supply agreement
Other Information
-