=== Summary Information === | === Summary Information === | ||
− | * Operator: | + | * Operator: Harbour Energy |
* Country: UK | * Country: UK | ||
* Location: blocks P011 and P0032 30/7a, Central North Sea | * Location: blocks P011 and P0032 30/7a, Central North Sea | ||
* Production start: 2013 | * Production start: 2013 | ||
− | * Partners: | + | * Partners: Harbour Energy - 67.0%, ENI - 33.0% |
* Type: Gas And Condensate | * Type: Gas And Condensate | ||
* Estimated Reserves: recoverable reserves are estimated at around 170 mmboe | * Estimated Reserves: recoverable reserves are estimated at around 170 mmboe | ||
Line 13: | Line 13: | ||
* It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade. | * It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade. | ||
* The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the [[Judy, Joanne and Jade Gas and Condensate Fields | Judy platform]] to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy. | * The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the [[Judy, Joanne and Jade Gas and Condensate Fields | Judy platform]] to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy. | ||
− | * From [[Judy, Joanne and Jade Gas | + | * From [[Judy, Joanne and Jade Gas and Condensate Fields | Judy]], gas is transported via the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]] |
=== Contractors === | === Contractors === | ||
Line 22: | Line 22: | ||
* **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities | * **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities | ||
* **Rosetti Marino:** | * **Rosetti Marino:** | ||
− | + | ** Procurement, Construction and Commissioning of Topsides for the Jasmine platform | |
− | + | ** Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures | |
* **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging | * **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging | ||
* **Saipem:** Wellhead, accomodation and process platforms | * **Saipem:** Wellhead, accomodation and process platforms | ||
* **FoundOcean:** Grouting for Jasmine Living Quarters & WHP | * **FoundOcean:** Grouting for Jasmine Living Quarters & WHP | ||
− | * **KWSubsea:** Pipeline Concept Engineering Services | + | * **KWSubsea:** Pipeline Concept Engineering Services |
=== History === | === History === | ||
Line 36: | Line 36: | ||
* 2010 - Dragados Offshore awarded deck contract | * 2010 - Dragados Offshore awarded deck contract | ||
* 2013 - First gas produced | * 2013 - First gas produced | ||
+ | * 2015 - Shell acquired BG Group and became a partner | ||
* 2017 - Chrysaor acquired Shell's stake in the field. | * 2017 - Chrysaor acquired Shell's stake in the field. | ||
+ | * 2019 - Chrysaor acquired Conocophillips's stake in the field | ||
+ | * 2021 - Premier Oil and Chrysaor merge to create Harbour Energy | ||
=== Geology === | === Geology === | ||
Line 57: | Line 60: | ||
# [http://killajoules.wikidot.com/archive:conocophilips-awards-a-new-contract-to-dragados-offs Conocophilips Awards A New Contract To Dragados Offshore] | # [http://killajoules.wikidot.com/archive:conocophilips-awards-a-new-contract-to-dragados-offs Conocophilips Awards A New Contract To Dragados Offshore] | ||
# [http://killajoules.wikidot.com/blog:4746 First gas production from UK Jasmine field] | # [http://killajoules.wikidot.com/blog:4746 First gas production from UK Jasmine field] | ||
+ | # [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell] | ||
# [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn] | # [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries] | ||
+ | # [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading] | ||
[[category:Field]] | [[category:Field]] | ||
[[category:UK]] | [[category:UK]] | ||
+ | [[category:Harbour Energy]] |
Latest revision as of 08:17, 31 October 2023
Summary Information
- Operator: Harbour Energy
- Country: UK
- Location: blocks P011 and P0032 30/7a, Central North Sea
- Production start: 2013
- Partners: Harbour Energy - 67.0%, ENI - 33.0%
- Type: Gas And Condensate
- Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
- Production Volume:
Description
- Jasmine is a high pressure, high temperature (HP/HT) gas condensate field located in Blocks 30/6 and 30/7 of the UK central North Sea approximately 255 kilometres south east of Aberdeen.
- It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.
- The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the Judy platform to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
- From Judy, gas is transported via the CATS Central Area Transmission System Gas Pipeline to the Teesside Gas Processing Plant TGPP
Contractors
- **Halliburton:** Directional drilling, logging-while-drilling (LWD) and surface data logging (SDL) services
- **Dragados Offshore:** Constructability analysis, construction engineering, partial purchases, construction, commissioning, load out and sea fastening of two decks
- **WorleyParsons:** Detailed engineering for three platforms, interconnecting bridges, pipe-in-pipe risers and spools along with the functional design and specification for the subsea pipeline, subsea isolation valves, power/communications cable and umbilicals
- **Subsea 7:** Engineering, procurement, fabrication, installation and commissioning of two approximately 4km pipeline bundle systems and associated pipe-in-pipe spools
- **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
- **Rosetti Marino:**
- Procurement, Construction and Commissioning of Topsides for the Jasmine platform
- Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
- **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
- **Saipem:** Wellhead, accomodation and process platforms
- **FoundOcean:** Grouting for Jasmine Living Quarters & WHP
- **KWSubsea:** Pipeline Concept Engineering Services
History
- 1964 - Licence awarded for the block
- 2006 - Jasmine Gas And Condensate Field discovered
- 2010 - WorleyParsons awarded Detailed engineering contract
- 2010 - Halliburton awarded drilling contract
- 2010 - Dragados Offshore awarded deck contract
- 2013 - First gas produced
- 2015 - Shell acquired BG Group and became a partner
- 2017 - Chrysaor acquired Shell's stake in the field.
- 2019 - Chrysaor acquired Conocophillips's stake in the field
- 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
Geology
Links
- Central North Sea, ConocoPhillips
- List Of Oil and Gas Production Platforms In The UK
- Saipem Fixed Offshore Production Facilities Project References
- FoundOcean Subsea References
- KWSubsea Subsea References
- Rosetti Marino Platform References
- BG Group announce substantial North Sea discovery
- Subsea 7 Confirms Contract for ConocoPhillips Jasmine Discovery in the North Sea
- IKM Testing Spain awarded a new contract
- Halliburton Wins Contract for Jasmine
- Award by ConocoPhillips for Jasmine Area Development
- AMEC awarded Judy and Jasmine contract North Sea
- Conocophilips Awards A New Contract To Dragados Offshore
- First gas production from UK Jasmine field
- Recommended cash and share offer for BG Group by Royal Dutch Shell
- Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn
- ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
- Harbour Energy to be admitted to trading