Difference between revisions of "Jasmine Gas and Condensate Field"

From A Barrel Full
Jump to navigation Jump to search
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
=== Summary Information ===
 
=== Summary Information ===
* Operator: ConocoPhillips
+
* Operator: Harbour Energy
 
* Country: UK
 
* Country: UK
 
* Location: blocks P011 and P0032 30/7a, Central North Sea
 
* Location: blocks P011 and P0032 30/7a, Central North Sea
 
* Production start: 2013
 
* Production start: 2013
* Partners: ConocoPhillips - 36.5, BG Group - 30.5%, ENI - 33.0%
+
* Partners: Harbour Energy - 67.0%, ENI - 33.0%
 
* Type: Gas And Condensate
 
* Type: Gas And Condensate
 
* Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
 
* Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
Line 13: Line 13:
 
* It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.  
 
* It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.  
 
* The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the [[Judy, Joanne and Jade Gas and Condensate Fields | Judy platform]] to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
 
* The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the [[Judy, Joanne and Jade Gas and Condensate Fields | Judy platform]] to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
* From [[Judy, Joanne and Jade Gas And Condensate Fields | Judy]], gas is trasported via the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]]
+
* From [[Judy, Joanne and Jade Gas and Condensate Fields | Judy]], gas is transported via the [[CATS Central Area Transmission System Gas Pipeline]] to the [[Teesside Gas Processing Plant TGPP]]
  
 
=== Contractors ===
 
=== Contractors ===
Line 22: Line 22:
 
* **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
 
* **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
 
* **Rosetti Marino:**  
 
* **Rosetti Marino:**  
* Procurement, Construction and Commissioning of Topsides for the Jasmine platform
+
** Procurement, Construction and Commissioning of Topsides for the Jasmine platform
* Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
+
** Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
 
* **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
 
* **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
 
* **Saipem:** Wellhead, accomodation and process platforms
 
* **Saipem:** Wellhead, accomodation and process platforms
 
* **FoundOcean:** Grouting for Jasmine Living Quarters & WHP
 
* **FoundOcean:** Grouting for Jasmine Living Quarters & WHP
* **KWSubsea:** Pipeline Concept Engineering Services  
+
* **KWSubsea:** Pipeline Concept Engineering Services
  
 
=== History ===
 
=== History ===
Line 36: Line 36:
 
* 2010 - Dragados Offshore awarded deck contract
 
* 2010 - Dragados Offshore awarded deck contract
 
* 2013 - First gas produced
 
* 2013 - First gas produced
 +
* 2015 - Shell acquired BG Group and became a partner
 
* 2017 - Chrysaor acquired Shell's stake in the field.
 
* 2017 - Chrysaor acquired Shell's stake in the field.
 +
* 2019 - Chrysaor acquired Conocophillips's stake in the field
 +
* 2021 - Premier Oil and Chrysaor merge to create Harbour Energy
  
 
=== Geology ===
 
=== Geology ===
Line 57: Line 60:
 
# [http://killajoules.wikidot.com/archive:conocophilips-awards-a-new-contract-to-dragados-offs Conocophilips Awards A New Contract To Dragados Offshore]
 
# [http://killajoules.wikidot.com/archive:conocophilips-awards-a-new-contract-to-dragados-offs Conocophilips Awards A New Contract To Dragados Offshore]
 
# [http://killajoules.wikidot.com/blog:4746 First gas production from UK Jasmine field]
 
# [http://killajoules.wikidot.com/blog:4746 First gas production from UK Jasmine field]
 +
# [https://abarrelfull.blogspot.com/2023/09/recommended-cash-and-share-offer-for-bg.html Recommended cash and share offer for BG Group by Royal Dutch Shell]
 
# [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn]
 
# [https://abarrelfull.blogspot.com/2021/11/shell-to-sell-package-of-uk-north-sea.html Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn]
 +
# [https://abarrelfull.blogspot.com/2023/10/conocophillips-completes-27-billion.html ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries]
 +
# [https://abarrelfull.blogspot.com/2023/10/harbour-energy-to-be-admitted-to-trading.html Harbour Energy to be admitted to trading]
  
 
[[category:Field]]
 
[[category:Field]]
 
[[category:UK]]
 
[[category:UK]]
 +
[[category:Harbour Energy]]

Latest revision as of 08:17, 31 October 2023

Summary Information

  • Operator: Harbour Energy
  • Country: UK
  • Location: blocks P011 and P0032 30/7a, Central North Sea
  • Production start: 2013
  • Partners: Harbour Energy - 67.0%, ENI - 33.0%
  • Type: Gas And Condensate
  • Estimated Reserves: recoverable reserves are estimated at around 170 mmboe
  • Production Volume:

Description

  • Jasmine is a high pressure, high temperature (HP/HT) gas condensate field located in Blocks 30/6 and 30/7 of the UK central North Sea approximately 255 kilometres south east of Aberdeen.
  • It is part of the J-Block first round licence awarded in 1964 and is the fourth development in the J-Area after Judy, Joanne and Jade.
  • The development consisting of a 24-slot wellhead platform (JWHP) with bridge-linked accommodation, came onstream in 2013. The JWHP is tied back to the Judy platform to the east via an 8-kilometre pipeline and a riser platform at Judy. Production from Jasmine is processed and exported through Judy.
  • From Judy, gas is transported via the CATS Central Area Transmission System Gas Pipeline to the Teesside Gas Processing Plant TGPP

Contractors

  • **Halliburton:** Directional drilling, logging-while-drilling (LWD) and surface data logging (SDL) services
  • **Dragados Offshore:** Constructability analysis, construction engineering, partial purchases, construction, commissioning, load out and sea fastening of two decks
  • **WorleyParsons:** Detailed engineering for three platforms, interconnecting bridges, pipe-in-pipe risers and spools along with the functional design and specification for the subsea pipeline, subsea isolation valves, power/communications cable and umbilicals
  • **Subsea 7:** Engineering, procurement, fabrication, installation and commissioning of two approximately 4km pipeline bundle systems and associated pipe-in-pipe spools
  • **AMEC:** Detailed engineering and procurement the existing Judy platform and the hook-up and commissioning of their new Jasmine facilities
  • **Rosetti Marino:**
    • Procurement, Construction and Commissioning of Topsides for the Jasmine platform
    • Construction engineering, procurement, fabrication, load-out and sea-fastening of JASMINE WHP, JLQ & JRP substructures
  • **IKM Testing:** Pressure Tests, Bolt Tensioning & Torquing, Hot Oil Flushing, Cleaning, Video Inspection, Test Engineering, Drying & N2 Purging
  • **Saipem:** Wellhead, accomodation and process platforms
  • **FoundOcean:** Grouting for Jasmine Living Quarters & WHP
  • **KWSubsea:** Pipeline Concept Engineering Services

History

  • 1964 - Licence awarded for the block
  • 2006 - Jasmine Gas And Condensate Field discovered
  • 2010 - WorleyParsons awarded Detailed engineering contract
  • 2010 - Halliburton awarded drilling contract
  • 2010 - Dragados Offshore awarded deck contract
  • 2013 - First gas produced
  • 2015 - Shell acquired BG Group and became a partner
  • 2017 - Chrysaor acquired Shell's stake in the field.
  • 2019 - Chrysaor acquired Conocophillips's stake in the field
  • 2021 - Premier Oil and Chrysaor merge to create Harbour Energy

Geology

Links

  1. Central North Sea, ConocoPhillips
  2. List Of Oil and Gas Production Platforms In The UK
  3. Saipem Fixed Offshore Production Facilities Project References
  4. FoundOcean Subsea References
  5. KWSubsea Subsea References
  6. Rosetti Marino Platform References
  7. BG Group announce substantial North Sea discovery
  8. Subsea 7 Confirms Contract for ConocoPhillips Jasmine Discovery in the North Sea
  9. IKM Testing Spain awarded a new contract
  10. Halliburton Wins Contract for Jasmine
  11. Award by ConocoPhillips for Jasmine Area Development
  12. AMEC awarded Judy and Jasmine contract North Sea
  13. Conocophilips Awards A New Contract To Dragados Offshore
  14. First gas production from UK Jasmine field
  15. Recommended cash and share offer for BG Group by Royal Dutch Shell
  16. Shell to sell package of UK North Sea assets to Chrysaor for up to $3.8bn
  17. ConocoPhillips Completes $2.7 Billion Sale of United Kingdom E&P Subsidiaries
  18. Harbour Energy to be admitted to trading