Summary Information
+
=== Summary Information ===
 
* Operator: Chevron
 
* Operator: Chevron
 
* Country: Australia
 
* Country: Australia
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* The Jansz–Io gas fields are located within production licenses WA-36-L, WA-39-L and WA-40-L approximately 200 km off the north-west coast of Western Australia in water depths of approximately 1,350 m
 
* The Jansz–Io gas fields are located within production licenses WA-36-L, WA-39-L and WA-40-L approximately 200 km off the north-west coast of Western Australia in water depths of approximately 1,350 m
 
* Gas is transported via subsea pipeline to Barrow Island
 
* Gas is transported via subsea pipeline to Barrow Island
Line 15: Line 15:
 
*  The Jansz-Io Compression (J-IC) project will involve the construction and installation of a 27,000-tonne normally unattended floating Field Control Station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island.
 
*  The Jansz-Io Compression (J-IC) project will involve the construction and installation of a 27,000-tonne normally unattended floating Field Control Station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island.
  
+++ Contractors
+
=== Contractors ===
 
* Original Project
 
* Original Project
 
**  
 
**  
Line 21: Line 21:
 
** '''Aker Solutions:''' Engineering, procurement and construction (EPC) of an all-electric subsea gas compression system. It also includes interface responsibility, and assistance during installation and commissioning.
 
** '''Aker Solutions:''' Engineering, procurement and construction (EPC) of an all-electric subsea gas compression system. It also includes interface responsibility, and assistance during installation and commissioning.
  
+++ History
+
=== History ===
 
* 2000 - The Jansz-Io gas field was discovered
 
* 2000 - The Jansz-Io gas field was discovered
 
* 2021 - FID for compression project
 
* 2021 - FID for compression project
 +
* 2021 - Aker Solutions awarded EPC for compression project
  
+++ Geology
+
=== Geology
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [http://www.nopsema.gov.au/assets/epsummaries/Submission-EP-Summary-Jansz-Feed-Gas-Pipeline-Wells-Operations.pdf Jansz Feed Gas Pipeline and Wells Operations (Commonwealth Waters) - Environment Plan Summary]
 
# [http://www.nopsema.gov.au/assets/epsummaries/Submission-EP-Summary-Jansz-Feed-Gas-Pipeline-Wells-Operations.pdf Jansz Feed Gas Pipeline and Wells Operations (Commonwealth Waters) - Environment Plan Summary]
 
# [https://abarrelfull.blogspot.com/2023/11/jansz-io-compression-project-to-proceed.html Jansz-Io Compression project to proceed]
 
# [https://abarrelfull.blogspot.com/2023/11/jansz-io-compression-project-to-proceed.html Jansz-Io Compression project to proceed]
 +
# [https://abarrelfull.blogspot.com/2023/11/aker-solutions-awarded-subsea-gas.html Aker Solutions Awarded Subsea Gas Compression Contract]

Revision as of 13:15, 28 November 2023

Summary Information

  • Operator: Chevron
  • Country: Australia
  • Location:
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

Description

  • The Jansz–Io gas fields are located within production licenses WA-36-L, WA-39-L and WA-40-L approximately 200 km off the north-west coast of Western Australia in water depths of approximately 1,350 m
  • Gas is transported via subsea pipeline to Barrow Island
  • The gas is to be used to feed the giant Gorgon LNG Terminal
  • The Jansz-Io Compression (J-IC) project will involve the construction and installation of a 27,000-tonne normally unattended floating Field Control Station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island.

Contractors

  • Original Project
  • Compression
    • Aker Solutions: Engineering, procurement and construction (EPC) of an all-electric subsea gas compression system. It also includes interface responsibility, and assistance during installation and commissioning.

History

  • 2000 - The Jansz-Io gas field was discovered
  • 2021 - FID for compression project
  • 2021 - Aker Solutions awarded EPC for compression project

=== Geology

Links

  1. Jansz Feed Gas Pipeline and Wells Operations (Commonwealth Waters) - Environment Plan Summary
  2. Jansz-Io Compression project to proceed
  3. Aker Solutions Awarded Subsea Gas Compression Contract