(Created page with "Summary Information * Operator: Chevron * Country: Australia * Location: * Production start: * Partners: * Type: Oil / Gas * Estimated Reserves: * Production Volume: +++...")
 
Line 5: Line 5:
 
* Production start:  
 
* Production start:  
 
* Partners:  
 
* Partners:  
* Type: Oil / Gas
+
* Type: Gas
 
* Estimated Reserves:  
 
* Estimated Reserves:  
 
* Production Volume:  
 
* Production Volume:  
Line 13: Line 13:
 
* Gas is transported via subsea pipeline to Barrow Island
 
* Gas is transported via subsea pipeline to Barrow Island
 
* The gas is to be used to feed the giant [[Gorgon LNG Terminal]]
 
* The gas is to be used to feed the giant [[Gorgon LNG Terminal]]
 +
*  The Jansz-Io Compression (J-IC) project will involve the construction and installation of a 27,000-tonne normally unattended floating Field Control Station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island.
  
 
+++ Contractors
 
+++ Contractors
Line 18: Line 19:
  
 
+++ History
 
+++ History
*  
+
* 2021 - FID for compression project
  
 
+++ Geology
 
+++ Geology
Line 25: Line 26:
 
+++ Links
 
+++ Links
 
# [http://www.nopsema.gov.au/assets/epsummaries/Submission-EP-Summary-Jansz-Feed-Gas-Pipeline-Wells-Operations.pdf Jansz Feed Gas Pipeline and Wells Operations (Commonwealth Waters) - Environment Plan Summary]
 
# [http://www.nopsema.gov.au/assets/epsummaries/Submission-EP-Summary-Jansz-Feed-Gas-Pipeline-Wells-Operations.pdf Jansz Feed Gas Pipeline and Wells Operations (Commonwealth Waters) - Environment Plan Summary]
 +
# [https://abarrelfull.blogspot.com/2023/11/jansz-io-compression-project-to-proceed.html Jansz-Io Compression project to proceed]

Revision as of 07:37, 28 November 2023

Summary Information

  • Operator: Chevron
  • Country: Australia
  • Location:
  • Production start:
  • Partners:
  • Type: Gas
  • Estimated Reserves:
  • Production Volume:

+++ Description

  • The Jansz–Io gas fields are located within production licenses WA-36-L, WA-39-L and WA-40-L approximately 200 km off the north-west coast of Western Australia in water depths of approximately 1,350 m
  • Gas is transported via subsea pipeline to Barrow Island
  • The gas is to be used to feed the giant Gorgon LNG Terminal
  • The Jansz-Io Compression (J-IC) project will involve the construction and installation of a 27,000-tonne normally unattended floating Field Control Station (FCS), approximately 6,500 tonnes of subsea compression infrastructure and a 135km submarine power cable linked to Barrow Island.

+++ Contractors

  • -

+++ History

  • 2021 - FID for compression project

+++ Geology

+++ Links

  1. Jansz Feed Gas Pipeline and Wells Operations (Commonwealth Waters) - Environment Plan Summary
  2. Jansz-Io Compression project to proceed