Jackdaw Gas Field
Jump to navigation
Jump to search
Summary Information
- Operator: Shell
- Country: United Kingdom
- Location:
- Production start:
- Partners:
- Type: Gas
- Estimated Reserves:
- Production Volume:
Description
- The Jackdaw field is located approximately 250 km east of Aberdeen, Scotland, and is adjacent to the UK/Norway median line.
- The Jackdaw development consists of a new Wellhead Platform (WHP), four production wells and a 31 km pipeline from the Jackdaw WHP to the Shearwater gas hub.
- Peak production from the field is estimated at 40,000 barrels of oil equivalent per day.
Contractors
- Aker Solutions
- Front-end engineering and design work (FEED)
- Engineering, procurement, construction, and installation (EPCI) of the complete wellhead platform, consisting of a topside and a steel jacket, as well as related load-out and offshore hook-up and commissioning.
- TechnipFMC
- EPCI for the 30 kilometre tieback from the new Jackdaw platform the Shearwater platform, as well as an associated riser, spoolpieces, subsea structures, and umbilicals.
History
- 2016 - Shell acquired BG Group, which previously owned the field
- 2017 - Siccar Point became a shareholder after acquiring OMV UK
- 2019 - FEED awarded
- 2022 - Approval granted for development
- 2022 - Final investment decision
- 2022 - Ithaca became a partner after buying Siccar Point
Geology
Links
- UK Oil and Gas Fields by Approval Date
- Recommended cash and share offer for BG Group by Royal Dutch Shell
- OMV closed the divestment of OMV (U.K.) Limited
- Shell invests in the Jackdaw gas field in the UK North Sea
- Aker Solutions ASA: Aker Solutions Awarded EPCI Contract for the Jackdaw Platform from Shell
- TechnipFMC Awarded a Significant Subsea Contract for Shell’s North Sea Development
- Completion of Acquisition of Siccar Point Energy