Difference between revisions of "JGC LNG Tank References"

From A Barrel Full
Jump to navigation Jump to search
Line 126: Line 126:
 
#* 5,000,000 T/Y x 2
 
#* 5,000,000 T/Y x 2
 
#* 2006
 
#* 2006
 +
# [[Nigeria LNG Terminal]]
 +
#* Bonny/Nigeria
 +
#* Nigeria LNG Ltd.
 +
#* EPC
 +
#* 4,000,000 T/Y x 2
 +
#* 2005
  
  
 
Client Scope
 
Nigeria LNG Ltd. EPC
 
Location Completion Capacity
 
Bonny/Nigeria 2005 4,000,000 T/Y x 2
 
LNG Plant
 
  
  

Revision as of 16:21, 2 December 2023

LNG Plant


  1. Pacific Northwest LNG Export Terminal Project
    • Pacific Northwest LNG Ltd
    • Lelu Island, Prince Rupert, British Columbia/Canada
    • FEED
    • 6,000,000,T/Y x2
    • On-going
  2. Anadarko Eni Mozambique LNG Terminal
    • Anadarko
    • Cabo Delgado province/Mozambique
    • LNG Plant
    • FEED
    • 5,000,000,T/Y x4
  3. Kitimat Lng Terminal
    • Chevron Canada
    • Bish Cove/Canada
    • LNG Plant
    • EPC
    • 5,500,000 T/Y x2
  4. Gorgon LNG Terminal
    • Gorgon JV
    • Barrow Island/Australia
    • LNG Plant
    • EPC
    • 5,000,000 T/Y x 3
  5. Ichthys LNG Terminal
    • Inpex / Total
    • Darwin/Australia
    • Floating LNG
    • EPC
    • 4,200,000 T/Y x 2
  6. Sabah FLNG Terminal
    • PETRONAS
    • Sabah/Malaysia
    • Floating LNG
    • EPC
    • 1,500,000,T/Y
  7. Malaysia LNG Terminal Train 9
    • PETRONAS
    • Bintulu/Malaysia
    • LNG Plant
    • 3,600,000 T/Y
    • On-going
  8. Donggi Senoro LNG Terminal
    • Mitsubishi
    • Sulawesi/Indonesia
    • LNG - FEED/EPCC
    • 2,000,000 T/Y
    • On-going
  9. Aomori LNG Terminal
    • JX Nippon Oil & Energy
    • Aomori/Japan
    • EPC
    • 140,000 KL x2
    • On-going
  10. Sabah FLNG Terminal
    • PETRONAS
    • Sabah/Malaysia
    • Floating LNG
    • FEED
    • 1,500,000,T/Y
    • 2013
  11. Santos Basin FLNG
    • PETROBRAS
    • Santos Basin pre-salt/Brazil
    • Floating LNG
    • FEED
    • 2,700,000 T/Y
    • 2010
  12. Browse LNG Terminal
    • Inpex
    • Darwin/Australia
    • LNG Plant
    • FEED
    • 4,200,000 T/Y x 2
    • 2010
  13. Tangguh LNG Terminal
    • BP
    • Bintuni, Papua/Indonesia
    • LNG Plant
    • EPCC
    • 7,600,000 T/Y
    • 2009
  14. Yemen LNG Terminal
    • Yemen LNG Company Ltd.
    • EPC
    • Balhaf/Yemen
    • 2009
    • 3,335,000 T/Y x2
  15. Gorgon LNG Terminal
    • Gorgon JV
    • Barrow Island/Australia
    • LNG Plant - Re-FEED
    • 5,000,000 T/Y x 3
    • 2009
  16. Nigeria LNG Terminal
    • Nigeria LNG Ltd
    • Bonny/Nigeria
    • EPC - LNG Plant
    • 4,000,000 T/Y
    • 2007
  17. Angola Soyo LNG Terminal
    • Soyo/Angola
    • Cabinda Gulf Oil Co., Ltd. (Chevron)
    • FEED - LNG Plant
    • 5,200,000 T/Y
    • 2006
  18. Sonatrach Skikda LNG Terminal
    • Skikda/Algeria
    • Sonatrach
    • FEED - LNG Plant
    • 4,000,000 T/Y
    • 2006
  19. Arzew LNG Terminal
    • Arzew/Algeria
    • Sonatrach/Repsol/GasNatural
    • LNG Plant - FEED
    • Capacity - 4,000,000 T/Y
    • 2006
  20. Gorgon LNG Terminal
    • Gorgon JV
    • Barrow Island/Australia
    • LNG Plant - FEED
    • 5,000,000 T/Y x 2
    • 2006
  21. Nigeria LNG Terminal
    • Bonny/Nigeria
    • Nigeria LNG Ltd.
    • EPC
    • 4,000,000 T/Y x 2
    • 2005



Client Scope Spanish Egyptian Gas Company EPC Location Completion Capacity Damietta/Egypt 2004 5,000,000 T/Y LNG Plant


Client Scope Woodside Energy Ltd. EPC Location Completion Capacity Dampier/Australia 2004 4,200,000 T/Y LNG Plant


Featured Project Client Scope Malaysia LNG Tiga EPC Location Completion Capacity Bintulu/Malaysia 2004 3,800,000 T/Y x 2 LNG Plant


Client Scope Nigeria LNG Ltd. EPC Location Completion Capacity Bonny/Nigeria 2003 2,950,000 T/Y x2 LNG Plant

Client Scope Peru LNG S.R.L. FEED Location Completion Capacity Pampa Melchorit/Peru 2003 4,400,000 T/Y LNG Plant


Client Scope Ras Laffan LNG Co., Ltd. EPC Location Completion Capacity Ras Laffan/Qatar 2000 3,200,000 T/Y LNG Plant


Client Scope Nigeria LNG Ltd. EPC Location Completion Capacity Bonny/Nigeria 1999 2,950,000 T/Y x2 LNG Plant


Client Scope Ras Laffan LNG Co., Ltd. EPC Location Completion Capacity Ras Laffan/Qatar 1999 3,200,000 T/Y LNG Plant


Featured Project Client Scope Malaysia LNG DUA EPC Location Completion Capacity Bintulu/Malaysia 1996 2,650,000 T/Y x 3 LNG Plant


Client Scope Woodside Offshore Petroleum Pty. Ltd. EPC Location Completion Capacity Dampier/Australia 1993 2,000,000 T/Y LNG Plant


Client Scope Woodside Offshore Petroleum Pty. Ltd. EPC Location Completion Capacity Dampier/Australia 1989 2,000,000 T/Y x2 LNG Plant


Client Scope PERTAMINA EPC Location Completion Capacity Arun/Indonesia 1986 1,500,000 T/Y LNG Plant


Featured Project Client Scope Malaysia LNG EPC Location Completion Capacity Bintulu/Malaysia 1984 2,000,000 T/Y x 3 LNG Plant


Client Scope Brunei LNG Ltd. EPC Location Completion Capacity Brunei 1975 1,000,000 T/Y LNG Plant


Client Scope Brunei LNG Ltd. EPC Location Completion Capacity Brunei 1973 1,000,000 T/Y x4 GTL

GTL Complex


Featured Project Client Scope Qatar Shell GTL Ltd EPCM Location Completion Capacity Ras Laffan/Qatar 2012 140,000BPD GTL Plant


Client Scope Shell MDS(Malaysia) Sdn. Bhd. EPC Location Completion Capacity Bintulu/Malaysia 1993 16,000 BPSD


+++ Relevant