JAGAL Gas Pipeline
Revision as of 14:10, 9 November 2023 by Abarrelfull (talk | contribs) (Created page with "Summary Information * Source: Frankfurt am Oder, Germany * Destination: Rückersdorf, Germany * Ownership: Wingas * Website: http://www.wingas.com/ * Length: kilometres ( m...")
Summary Information
- Source: Frankfurt am Oder, Germany
- Destination: Rückersdorf, Germany
- Ownership: Wingas
- Website: http://www.wingas.com/
- Length: kilometres ( miles)
- Capacity: per day
- Status: Operating
+++ Details
- The pipeline runs from Frankfurt am Oder to Rückersdorf, where it connects with STEGAL
- It links the [[[Yamal Europe Pipeline]]] to Wingas German transmission system
+++ History
- 1995 - Construction of the pipeline began
- 1999 - The first gas flows through the pipeline
+++ Other Information
- -
+++ Links