JAGAL Gas Pipeline

From A Barrel Full
Jump to navigation Jump to search

Summary Information

  • Source: Frankfurt am Oder, Germany
  • Destination: Rückersdorf, Germany
  • Ownership: Wingas
  • Website: http://www.wingas.com/
  • Length: kilometres ( miles)
  • Capacity: per day
  • Status: Operating

+++ Details

  • The pipeline runs from Frankfurt am Oder to Rückersdorf, where it connects with STEGAL
  • It links the [[[Yamal Europe Pipeline]]] to Wingas German transmission system

+++ History

  • 1995 - Construction of the pipeline began
  • 1999 - The first gas flows through the pipeline

+++ Other Information

  • -

+++ Links

  1. Wingas History, 1999