Summary Information
- Operator: Edison
- Country: Croatia
- Location: Offshore, northern part of Adriatic Sea
- Production start: 2014
- Partners:
- Type: Gas
- Estimated Reserves: Total 2P reserves - 1.4 billion cm (8.5 MMboe) of gas
- Production Volume:
+++ Description
- Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth
+++ Contractors
- **Tecon:** Feed Design of the platforms and interconnecting sealines
- **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North Jacket & wellhead platform, & South wellhead platform
- **Viktor Lenac:** Izabela North - Gas production platform
- **Micoperi:**
* Izabela North & Izabela South Platforms Installation * Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long)
- **FoundOcean:** Grouting for platforms
+++ History
- 2007 - FEED contract awarded
- 2014 - First gas produced
- 2019 - Energean acquired a stake in the field from Edison
+++ Geology
+++ Links
- Tecon Platform References
- Micoperi Offshore And Platform References
- Micoperi Offshore Pipeline References
- FoundOcean Subsea References
- Viktor Lenac Platform References
- Rosetti Marino Platform References
- Start of gas production on the Izabela field in the Adriatic Sea
- Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.