− | Summary Information | + | === Summary Information === |
− | * Operator: | + | * Operator: Energean |
* Country: Croatia | * Country: Croatia | ||
* Location: Offshore, northern part of Adriatic Sea | * Location: Offshore, northern part of Adriatic Sea | ||
Line 9: | Line 9: | ||
* Production Volume: | * Production Volume: | ||
− | + | === Description === | |
* Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth | * Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth | ||
− | + | === Contractors === | |
* **Tecon:** Feed Design of the platforms and interconnecting sealines | * **Tecon:** Feed Design of the platforms and interconnecting sealines | ||
* **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North Jacket & wellhead platform, & South wellhead platform | * **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North Jacket & wellhead platform, & South wellhead platform | ||
* **Viktor Lenac:** Izabela North - Gas production platform | * **Viktor Lenac:** Izabela North - Gas production platform | ||
* **Micoperi:** | * **Micoperi:** | ||
− | + | ** Izabela North & Izabela South Platforms Installation | |
− | + | ** Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long) | |
* **FoundOcean:** Grouting for platforms | * **FoundOcean:** Grouting for platforms | ||
− | + | === History === | |
* 2007 - FEED contract awarded | * 2007 - FEED contract awarded | ||
* 2014 - First gas produced | * 2014 - First gas produced | ||
* 2019 - Energean acquired a stake in the field from Edison | * 2019 - Energean acquired a stake in the field from Edison | ||
− | + | === Geology === | |
* | * | ||
− | + | === Links === | |
# [[Tecon Platform References]] | # [[Tecon Platform References]] | ||
# [[Micoperi Offshore And Platform References]] | # [[Micoperi Offshore And Platform References]] | ||
Line 38: | Line 38: | ||
# [http://killajoules.wikidot.com/blog:5303 Start of gas production on the Izabela field in the Adriatic Sea] | # [http://killajoules.wikidot.com/blog:5303 Start of gas production on the Izabela field in the Adriatic Sea] | ||
# [https://abarrelfull.blogspot.com/2023/10/edison-announces-signing-of-agreement.html Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.] | # [https://abarrelfull.blogspot.com/2023/10/edison-announces-signing-of-agreement.html Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.] | ||
+ | |||
+ | [[category:Field]] | ||
+ | [[category:Croatia]] | ||
+ | [[category:Energean]] |
Latest revision as of 11:45, 16 October 2023
Summary Information
- Operator: Energean
- Country: Croatia
- Location: Offshore, northern part of Adriatic Sea
- Production start: 2014
- Partners:
- Type: Gas
- Estimated Reserves: Total 2P reserves - 1.4 billion cm (8.5 MMboe) of gas
- Production Volume:
Description
- Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth
Contractors
- **Tecon:** Feed Design of the platforms and interconnecting sealines
- **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North Jacket & wellhead platform, & South wellhead platform
- **Viktor Lenac:** Izabela North - Gas production platform
- **Micoperi:**
- Izabela North & Izabela South Platforms Installation
- Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long)
- **FoundOcean:** Grouting for platforms
History
- 2007 - FEED contract awarded
- 2014 - First gas produced
- 2019 - Energean acquired a stake in the field from Edison
Geology
Links
- Tecon Platform References
- Micoperi Offshore And Platform References
- Micoperi Offshore Pipeline References
- FoundOcean Subsea References
- Viktor Lenac Platform References
- Rosetti Marino Platform References
- Start of gas production on the Izabela field in the Adriatic Sea
- Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.