Summary Information
+
=== Summary Information ===
* Operator: Edison
+
* Operator: Energean
 
* Country: Croatia  
 
* Country: Croatia  
 
* Location: Offshore, northern part of Adriatic Sea
 
* Location: Offshore, northern part of Adriatic Sea
Line 9: Line 9:
 
* Production Volume:  
 
* Production Volume:  
  
+++ Description
+
=== Description ===
 
* Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth
 
* Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth
  
+++ Contractors
+
=== Contractors ===
 
* **Tecon:** Feed Design of the platforms and interconnecting sealines  
 
* **Tecon:** Feed Design of the platforms and interconnecting sealines  
 
* **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North  Jacket & wellhead platform, & South wellhead platform
 
* **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North  Jacket & wellhead platform, & South wellhead platform
 
* **Viktor Lenac:** Izabela North - Gas production platform
 
* **Viktor Lenac:** Izabela North - Gas production platform
 
* **Micoperi:**  
 
* **Micoperi:**  
* Izabela North & Izabela South Platforms Installation
+
** Izabela North & Izabela South Platforms Installation
* Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long)
+
** Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long)
 
* **FoundOcean:** Grouting for platforms
 
* **FoundOcean:** Grouting for platforms
  
+++ History
+
=== History ===
 
* 2007 - FEED contract awarded
 
* 2007 - FEED contract awarded
 
* 2014 - First gas produced
 
* 2014 - First gas produced
 
* 2019 - Energean acquired a stake in the field from Edison
 
* 2019 - Energean acquired a stake in the field from Edison
  
+++ Geology
+
=== Geology ===
 
*  
 
*  
  
+++ Links
+
=== Links ===
 
# [[Tecon Platform References]]
 
# [[Tecon Platform References]]
 
# [[Micoperi Offshore And Platform References]]
 
# [[Micoperi Offshore And Platform References]]
Line 38: Line 38:
 
# [http://killajoules.wikidot.com/blog:5303 Start of gas production on the Izabela field in the Adriatic Sea]
 
# [http://killajoules.wikidot.com/blog:5303 Start of gas production on the Izabela field in the Adriatic Sea]
 
# [https://abarrelfull.blogspot.com/2023/10/edison-announces-signing-of-agreement.html Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.]
 
# [https://abarrelfull.blogspot.com/2023/10/edison-announces-signing-of-agreement.html Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.]
 +
 +
[[category:Field]]
 +
[[category:Croatia]]
 +
[[category:Energean]]

Latest revision as of 11:45, 16 October 2023

Summary Information

  • Operator: Energean
  • Country: Croatia
  • Location: Offshore, northern part of Adriatic Sea
  • Production start: 2014
  • Partners:
  • Type: Gas
  • Estimated Reserves: Total 2P reserves - 1.4 billion cm (8.5 MMboe) of gas
  • Production Volume:

Description

  • Field development consists of two Platforms, Izabela South & Izabela North, and interconnecting sealines installed in about 40m water depth

Contractors

  • **Tecon:** Feed Design of the platforms and interconnecting sealines
  • **Rosetti Marino:** Fabrication engineering, Procurement, Construction, On-shore Commissioning, Load-out, Sea Fastening, Transportation to Site, Hook-up, Commissioning, Assistance to Start up for North Jacket & wellhead platform, & South wellhead platform
  • **Viktor Lenac:** Izabela North - Gas production platform
  • **Micoperi:**
    • Izabela North & Izabela South Platforms Installation
    • Sealines Laying: Izabela N to Ivana K (16”, 26km long) & Izabela N to Izabela S (10”+3”, 2,97km long)
  • **FoundOcean:** Grouting for platforms

History

  • 2007 - FEED contract awarded
  • 2014 - First gas produced
  • 2019 - Energean acquired a stake in the field from Edison

Geology

Links

  1. Tecon Platform References
  2. Micoperi Offshore And Platform References
  3. Micoperi Offshore Pipeline References
  4. FoundOcean Subsea References
  5. Viktor Lenac Platform References
  6. Rosetti Marino Platform References
  7. Start of gas production on the Izabela field in the Adriatic Sea
  8. Edison announces the signing of the agreement with Energean Oil and Gas to sell the 100% of Edison Exploration and Production (E&P) and its subsidiaries in the hydrocarbons exploration and production business. The signing follows the approval of the transaction by the Edison Board of Directors on July 3, 2019.